1988 Ed.]
Noise Control
[CAP. 400
3
CHAPTER 400
NOISE CONTROL
To provide for the prevention, minimizing and abatement of noise; the appointment of a Noise Control Authority; the powers and duties of the Noise Control Authority relating to the control of noise; the creation of offences; and for connected purposes.
Originally 75 of 1988-
PART I
PRELIMINARY
175 of 1888 | LN24x of 1989.
Short title and commencement
1.
(1) This Ordinance may be cited as the Noise Control Ordinance.
(2) This Ordinance shall come into operation on a day to be appointed by the Governor by notice in the Gazette and notices under this section may appoint different dates for the coming into operation of different provisions of this Ordinance.
Interpretation
2. In this Ordinance, unless the context otherwise requires-
"annoyance" means annoyance that would not be tolerated by a reasonable person;
"Appeal Board" means the Appeal Board constituted under section 21;
"Authority" means the Noise Control Authority appointed under section 3(1);
"Chairman" means the person appointed as Chairman of the Appeal Board under section 20(2);
"construction noise permit" means a construction noise permit issued under section 8(1);
"construction site" means a place where construction work is carried out;
"construction work" includes
(a) any work in connection with or for the construction, demolition, reconstruction, shoring, alteration, maintenance or repair, of the whole or any part of any building, arch, bridge, chimney, dock, hoarding, shelter, tunnel, wall, pier, wharf or other structure or any road, slope, embankment, street, railway, tramway, airport, channel, drain, service lane, sewer, water conduit, lighting or public utility;
1988 Ed.]
Noise Control
[CAP. 400
3
CHAPTER 400
NOISE CONTROL
To provide for the prevention, minimizing and abatement of noise; the appoint- ment of a Noise Control Authority; the powers and duties of the Noise Control Authority relating to the control of noise; the creation of offences; and for connected purposes.
Originally 75 of 1988-
PARTI
PRELIMINARY
175 of 1888
| LN24x of 1989.
Short title and commencement
1.
(1) This Ordinance may be cited as the Noise Control Ordinance.
(2) This Ordinance shall come into operation on a day to be appointed by the Governor by notice in the Gazette and notices under this section may appoint different dates for the coming into operation of different provisions of this Ordinance.
> Interpretation
retation
2. In this Ordinance, unless the context otherwise requires-
"annoyance" means annoyance that would not be tolerated by a reasonable
person;
"Appeal Board" means the Appeal Board constituted under section 21;
"Authority" means the Noise Control Authority appointed under section 3(1);
"Chairman" means the person appointed as Chairman of the Appeal Board
under section 20(2);
"construction noise permit” means a construction noise permit issued under
· section 8(1);
"construction site” means a place where construction work is carried out;
"construction work” includes
(a) any work in connection with or for the construction, demolition, reconstruction, shoring, alteration, maintenance or repair, of the whole or any part of any building, arch, bridge, chimney, dock, hoarding, shelter, tunnel, wall, pier, wharf or other structure or any road, slope, embankment, street, railway, tramway, airport, channel, drain, service lane, sewer, water conduit, lighting or public utility;