1964_NOISE_CONTROL_ORDINANCE — Page 10

HK Historical Laws 香港歷史法例 All AI Reviewed

1988 Ed.]

Noise Control

[CAP. 400

9

(iii) except where the construction noise permit is in respect of any percussive piling, the public interest so requires.

(12) Where the Authority cancels a construction noise permit or amends or varies the conditions of a construction noise permit or imposes new conditions in relation to a construction noise permit under subsection (9), (10) or (11)(b), the Authority shall give written notice of the decision to the person to whom the construction noise permit was issued and shall adequately state in the notice the reasons for the cancellation, or the amendment or variation of conditions, or the imposition of new conditions, as the case may be.

(13) Without prejudice to the generality of subsection (1), (9) or (10) the conditions that the Authority may impose in relation to a construction noise permit may provide for-

(a) the display of the construction noise permit or a copy thereof at any specified location;

(b) maximum noise levels that shall not be exceeded at any specified location at any specified time;

(c) limitations relating to the time when any specified powered mechanical equipment may be used; and

(d) limitations relating to the time when any specified construction work may be carried out,

and for the purposes of this subsection "specified" means specified in the construction noise permit.

Technical Memoranda relating to noise emanating from construction sites

9. (1) The Secretary may issue from time to time Technical Memoranda setting out principles, procedures, guidelines, standards and limits for-

(a) the prediction, measurement and assessment of noise emanating from a construction site;

(b) the issuing of construction noise permits;

(c) the imposition and variation of conditions in relation to construction noise permits;

(d) the determination of whether or not the conditions of a construction noise permit are being complied with,

and those Technical Memoranda may require or authorize the Authority, in any particular case, to follow the advice of the Secretary in relation to paragraphs (b) and (c).

(2) The Authority shall be guided by Technical Memoranda issued from time to time under subsection (1) when carrying out his functions in respect of noise emanating from a construction site.

(3) A copy of every Technical Memorandum issued from time to time under subsection (1) shall be made available by the Secretary for inspection by the public free of charge at such offices of the Government as the Secretary may direct, during the hours of business.

Page 10

Page 11

Edit History

2026-05-05 03:59:44 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
1988 Ed.] Noise Control [CAP. 400 9 (iii) except where the construction noise permit is in respect of any percussive piling, the public interest so requires. (12) Where the Authority cancels a construction noise permit or amends or varies the conditions of a construction noise permit or imposes new conditions in relation to a construction noise permit under subsection (9), (10) or (11)(b), the Authority shall give written notice of the decision to the person to whom the construction noise permit was issued and shall adequately state in the notice the reasons for the cancellation, or the amendment or variation of conditions, or the imposition of new conditions, as the case may be. (13) Without prejudice to the generality of subsection (1), (9) or (10) the conditions that the Authority may impose in relation to a construction noise permit may provide for- (a) the display of the construction noise permit or a copy thereof at any specified location; (b) maximum noise levels that shall not be exceeded at any specified location at any specified time; (c) limitations relating to the time when any specified powered mechanical equipment may be used; and (d) limitations relating to the time when any specified construction work may be carried out, and for the purposes of this subsection "specified" means specified in the construction noise permit. Technical Memoranda relating to noise emanating from construction sites 9. (1) The Secretary may issue from time to time Technical Memoranda setting out principles, procedures, guidelines, standards and limits for- (a) the prediction, measurement and assessment of noise emanating from a construction site; (b) the issuing of construction noise permits; (c) the imposition and variation of conditions in relation to construction noise permits; (d) the determination of whether or not the conditions of a construction noise permit are being complied with, and those Technical Memoranda may require or authorize the Authority, in any particular case, to follow the advice of the Secretary in relation to paragraphs (b) and (c). (2) The Authority shall be guided by Technical Memoranda issued from time to time under subsection (1) when carrying out his functions in respect of noise emanating from a construction site. (3) A copy of every Technical Memorandum issued from time to time under subsection (1) shall be made available by the Secretary for inspection by the public free of charge at such offices of the Government as the Secretary may direct, during the hours of business. Page 10 Page 11
Baseline (Original)
1988 Ed.] Noise Control [CAP. 400 9 (iii) except where the construction noise permit is in respect of any percussive piling, the public interest so requires. (12) Where the Authority cancels a construction noise permit or amends or varies the conditions of a construction noise permit or imposes new conditions in relation to a construction noise permit under subsection (9), (10) or (11)(b), the Authority shall give written notice of the decision to the person to whom the construction noise permit was issued and shall adequately state in the notice the reasons for the cancellation, or the amendment or variation of conditions, or the imposition of new conditions, as the case may be. (13) Without prejudice to the generality of subsection (1), (9) or (10) the conditions that the Authority may impose in relation to a construction noise permit may provide for- (a) the display of the construction noise permit or a copy thereof at any specified location; (b) maximum noise levels that shall not be exceeded at any specified location at any specified time; (c) limitations relating to the time when any specified powered mechanical equipment may be used; and (d) limitations relating to the time when any specified construction work may be carried out, and for the purposes of this subsection "specified" means specified in the construction noise permit. Technical Memoranda relating to noise emanating from construction sites 9. (1) The Secretary may issue from time to time Technical Memoranda setting out principles, procedures, guidelines, standards and limits for- (a) the prediction, measurement and assessment of noise emanating from a construction site; (b) the issuing of construction noise permits; (c) the imposition and variation of conditions in relation to construction noise permits; (d) the determination of whether or not the conditions of a construction noise permit are being complied with, and those Technical Memoranda may require or authorize the Authority, in any particular case, to follow the advice of the Secretary in relation to paragraphs (b) and (c). (2) The Authority shall be guided by Technical Memoranda issued from time to time under subsection (1) when carrying out his functions in respect of noise emanating from a construction site. (3) A copy of every Technical Memorandum issued from time to time under subsection (1) shall be made available by the Secretary for inspection by the public free of charge at such offices of the Government as the Secretary may direct, during the hours of business. Page 10Page 11
2026-05-05 03:59:44 · Baseline
View content

1988 Ed.]

Noise Control

[CAP. 400

9

(iii) except where the construction noise permit is in respect of any percussive piling, the public interest so requires.

(12) Where the Authority cancels a construction noise permit or amends or varies the conditions of a construction noise permit or imposes new conditions in relation to a construction noise permit under subsection (9), (10) or (11)(b), the Authority shall give written notice of the decision to the person to whom the construction noise permit was issued and shall adequately state in the notice the reasons for the cancellation, or the amendment or variation of conditions, or the imposition of new conditions, as the case may be.

(13) Without prejudice to the generality of subsection (1), (9) or (10) the conditions that the Authority may impose in relation to a construction noise permit may provide for-

(a) the display of the construction noise permit or a copy thereof at any

specified location;

(b) maximum noise levels that shall not be exceeded at any specified

location at any specified time;

(c) limitations relating to the time when any specified powered

mechanical equipment may be used; and

(d) limitations relating to the time when any specified construction work

may be carried out,

and for the purposes of this subsection "specified" means specified in the construction noise permit.

Technical Memoranda relating to noise emanating from construction sites

9. (1) The Secretary may issue from time to time Technical Memoranda setting out principles, procedures, guidelines, standards and limits for-

(a) the prediction, measurement and assessment of noise emanating from

a construction site;

(b) the issuing of construction noise permits;

(c) the imposition and variation of conditions in relation to construction

noise permits;

(d) the determination of whether or not the conditions of a construction

noise permit are being complied with,

and those Technical Memoranda may require or authorize the Authority, in any particular case, to follow the advice of the Secretary in relation to paragraphs (b) and (c).

(2) The Authority shall be guided by Technical Memoranda issued from time to time under subsection (1) when carrying out his functions in respect of noise emanating from a construction site.

(3) A copy of every Technical Memorandum issued from time to time under subsection (1) shall be made available by the Secretary for inspection by the public free of charge at such offices of the Government as the Secretary may direct, during the hours of business.

Page 10Page 11

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.