CAP. 400]

Noise Control (General) Regulations

[1989 Ed.

[Subsidiary]

Note:

2 photographs of each item of equipment applied for must be submitted and, in the case of equipment bearing an identification code, endorsed with that code. The photographs may be of the actual piece of equipment to be used or of one essentially the same.

5. Additional information

5a. Specify any particularly quiet items of powered mechanical equipment or any special noise control measures to be employed on site, or any other special factors or exceptional circumstances which are thought to be relevant.

5b. Give any additional information which is thought to be relevant to this application.

Dated this day of

Signed: Applicant.

Please note:

1. The applicant is advised to read the Noise Control Ordinance, the Noise Control (General) Regulations and the Technical Memorandum on Noise from Construction Work other than Percussive Piling before submitting this application. The Authority shall be guided by the Technical Memorandum in considering an application.

2. Section 8(4) of the Ordinance provides that not later than 28 days after an application is received by the Authority, he shall issue a construction noise permit or serve on the applicant written notice of his refusal to issue the permit, and if at the end of those 28 days he has done neither of those things a permit shall be deemed to have been issued.

3. A construction noise permit that is issued in consequence of misleading, false, wrong or incomplete information furnished by an applicant in connection with the application is liable to be cancelled.

4. The fee payable on submission of this application will not be refunded.

Edit History

2026-05-05 03:56:39 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
CAP. 400] Noise Control (General) Regulations [1989 Ed. [Subsidiary] Note: 2 photographs of each item of equipment applied for must be submitted and, in the case of equipment bearing an identification code, endorsed with that code. The photographs may be of the actual piece of equipment to be used or of one essentially the same. 5. Additional information 5a. Specify any particularly quiet items of powered mechanical equipment or any special noise control measures to be employed on site, or any other special factors or exceptional circumstances which are thought to be relevant. 5b. Give any additional information which is thought to be relevant to this application. Dated this day of Signed: Applicant. Please note: 1. The applicant is advised to read the Noise Control Ordinance, the Noise Control (General) Regulations and the Technical Memorandum on Noise from Construction Work other than Percussive Piling before submitting this application. The Authority shall be guided by the Technical Memorandum in considering an application. 2. Section 8(4) of the Ordinance provides that not later than 28 days after an application is received by the Authority, he shall issue a construction noise permit or serve on the applicant written notice of his refusal to issue the permit, and if at the end of those 28 days he has done neither of those things a permit shall be deemed to have been issued. 3. A construction noise permit that is issued in consequence of misleading, false, wrong or incomplete information furnished by an applicant in connection with the application is liable to be cancelled. 4. The fee payable on submission of this application will not be refunded.
Baseline (Original)
A 6 CAP. 400] Noise Control (General) Regulations [1989 Ed. [Subsidiary] Note: 2 photographs of each item of equipment applied for must be submitted and, in the case of equipment bearing an identification code, endorsed with that code. The photographs may be of the actual piece of equipment to be used or of one essentially the same. 5. Additional information Sa. Specify any particularly quiet items of powered mechanical equipment or any special noise control measures to be employed on site, or any other special factors or exceptional circumstances which are thought to be relevant. 5b. Give any additional information which is thought to be relevant to this application. Dated this day of Signed: Applicant. Please note: 1. 2. 3. 4. The applicant is advised to read the Noise Control Ordinance, the Noise Control (General) Regulations and the Technical Memorandum on Noise from Construction Work other than Percussive Piling before submitting this application. The Authority shall be guided by the Technical Memorandum in considering an application. Section 8(4) of the Ordinance provides that not later than 28 days after an application is received by the Authority, he shall issue a construction noise permit or serve on the applicant written notice of his refusal to issue the permit, and if at the end of those 28 days he has done neither of those things a permit shall be deemed to have been issued. A construction noise permit that is issued in consequence of misleading, false, wrong or incomplete information furnished by an applicant in connection with the application is liable to be cancelled. The fee payable on submission of this application will not be refunded.
2026-05-05 03:56:39 · Baseline
View content

A 6

CAP. 400]

Noise Control (General) Regulations

[1989 Ed.

[Subsidiary]

Note:

2 photographs of each item of equipment applied for must be submitted and, in the case of equipment bearing an identification code, endorsed with that code. The photographs may be of the actual piece of equipment to be used or of one essentially the same.

5.

Additional information

Sa. Specify any particularly quiet items of powered mechanical equipment or any special noise control measures to be employed on site, or any other special factors or exceptional circumstances which are thought to be relevant.

5b. Give any additional information which is thought to be relevant to this application.

Dated this

day of

Signed:

Applicant.

Please note:

1.

2.

3.

4.

The applicant is advised to read the Noise Control Ordinance, the Noise Control (General) Regulations and the Technical Memorandum on Noise from Construction Work other than Percussive Piling before submitting this application. The Authority shall be guided by the Technical Memorandum in considering an application.

Section 8(4) of the Ordinance provides that not later than 28 days after an application is received by the Authority, he shall issue a construction noise permit or serve on the applicant written notice of his refusal to issue the permit, and if at the end of those 28 days he has done neither of those things a permit shall be deemed to have been issued.

A construction noise permit that is issued in consequence of misleading, false, wrong or incomplete information furnished by an applicant in connection with the application is liable to be cancelled.

The fee payable on submission of this application will not be refunded.