1964_ELECTRICITY_SUPPLY_REGULATIONS — Page 1

HK Historical Laws 香港歷史法例 All AI Reviewed

1984 EN OF

VER

UNI

Electricity Supply Regulations

[CAP. 103

A 1

AG

[Subsidiary]

ELECTRICITY SUPPLY REGULATIONS

NG

Regulation

1.

2.

3.

LAW

LIBRARY

Interpretation

ARRANGEMENT OF REGULATIONS

Pressure of supply to consumers

Page

:

A 3

A 4

Introduction of three-wire system into consumer's premises

A 5

4.

Minimum size of conductors

A 5

5.

Insulation test of low pressure and medium pressure mains

A 6

6.

Testing of insulation of all parts of high pressure circuit

A 6

7.

Maintenance of insulation

A 6

8.

Circuit-breaker for high pressure mains, etc.

A 6

9.

Transformers

**

A 6

10.

Connexion of transformers with earth

A 6

11.

Protection from lightning

A 7

1

Report of accidents to Director of Electrical and Mechanical Services

A 7

13.

Material of line conductors

+

A 7

14.

Other overhead lines

A 11

15.

Construction of receptacles for electric lines ...

A 12

16.

Crossing pipes, etc.

A 12

17.

Electric continuity of metal conduits, etc., of high pressure line...

A 12

j

18.

Precautions to be taken when bare conductors are used

A 12

19.

High pressure lines laid above ground or in subways

:

A 12

20.

Protection for surface of ground and electric lines

:

A 12

21.


22.

23.

24.

25.

26.

Completion and control of high pressure lines

Sub-stations

Street boxes

Maximum power in case of underground sub-station, etc.

Responsibility of company for lines, etc., on consumer's premises

Fire risks

A 13

:

A 13

:

A 13

A 13

A 14

A 14

27.

Main fuses or circuit-breakers

A 14

28.

Treatment of service lines and apparatus on consumer's premises

A 14

29.


30.

Appeal to Director of Electrical and Mechanical Services

31.


32.


33.

Penalty for making addition to electrical installation

34.

Penalty on consumer for addition to electrical installation ...

35.

Height from ground ...

36.

Arc lamps to be guarded

37.

Connexion with earth of a three-wire system...

Transformers and high pressure apparatus to be inclosed in metal, etc.

Connexion to consumer's premises not to be made where undue leakage would result

Discontinuance of supply on discovery of leakage on consumer's premises

A 14

#14

A 14

A 16

A 16

A 16

A 16

A 16

A 16

Edit History

2026-05-04 15:37:18 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
1984 EN OF VER UNI Electricity Supply Regulations [CAP. 103 A 1 AG [Subsidiary] ELECTRICITY SUPPLY REGULATIONS NG Regulation 1. 2. 3. LAW LIBRARY Interpretation ARRANGEMENT OF REGULATIONS Pressure of supply to consumers Page : A 3 A 4 Introduction of three-wire system into consumer's premises A 5 4. Minimum size of conductors A 5 5. Insulation test of low pressure and medium pressure mains A 6 6. Testing of insulation of all parts of high pressure circuit A 6 7. Maintenance of insulation A 6 8. Circuit-breaker for high pressure mains, etc. A 6 9. Transformers ** A 6 10. Connexion of transformers with earth A 6 11. Protection from lightning A 7 1 Report of accidents to Director of Electrical and Mechanical Services A 7 13. Material of line conductors + A 7 14. Other overhead lines A 11 15. Construction of receptacles for electric lines ... A 12 16. Crossing pipes, etc. A 12 17. Electric continuity of metal conduits, etc., of high pressure line... A 12 j 18. Precautions to be taken when bare conductors are used A 12 19. High pressure lines laid above ground or in subways : A 12 20. Protection for surface of ground and electric lines : A 12 21. 22. 23. 24. 25. 26. Completion and control of high pressure lines Sub-stations Street boxes Maximum power in case of underground sub-station, etc. Responsibility of company for lines, etc., on consumer's premises Fire risks A 13 : A 13 : A 13 A 13 A 14 A 14 27. Main fuses or circuit-breakers A 14 28. Treatment of service lines and apparatus on consumer's premises A 14 29. 30. Appeal to Director of Electrical and Mechanical Services 31. 32. 33. Penalty for making addition to electrical installation 34. Penalty on consumer for addition to electrical installation ... 35. Height from ground ... 36. Arc lamps to be guarded 37. Connexion with earth of a three-wire system... Transformers and high pressure apparatus to be inclosed in metal, etc. Connexion to consumer's premises not to be made where undue leakage would result Discontinuance of supply on discovery of leakage on consumer's premises A 14 #14 A 14 A 16 A 16 A 16 A 16 A 16 A 16
Baseline (Original)
1984 EN OF VER UNI Electricity Supply Regulations [CAP. 103 A 1 AG [Subsidiary] ELECTRICITY SUPPLY REGULATIONS NG Regulation 1. 2. 3. LAW LIBRARY Interpretation ARRANGEMENT OF REGULATIONS Pressure of supply to consumers Page : A 3 A 4 Introduction of three-wire system into consumer's premises A 5 4. Minimum size of conductors A S 5. Insulation test of low pressure and medium pressure mains A 6 6. Testing of insulation of all parts of high pressure circuit A 6 7. Maintenance of insulation A 6 8. Circuit-breaker for high pressure mains, etc. A 6 9. Transformers ** A 6 10. Connexion of transformers with earth A 6 11. Protection from lightning A 7 1 Report of accidents to Director of Electrient- und Mechanical Services- 7 13. Material of line conductors + A 7 14. Other overhead lines A 11 15. Construction of receptacles for electric lines ... A 12 16. Crossing pipes, etc. A 12. 17. Electric continuity of metal conduits, etc., of high pressure line... A 12 j 18. Precautions to be taken when bare conductors are used A 12 19. High pressure lines laid above ground or in subways : A 12 20. Protection for surface of ground and electric lines : A 12 21. 22. 23. 24. 25. 26. Completion and control of high pressure lines Sub-stations Street boxes Maximum power in case of underground sub-station, etc. Responsibility of company for lines, etc., on consumer's premises Fire risks A 13 : A 13 : A 13 A 13 A 14 A 14 27. Main fuses or circuit-breakers A 14 28. Treatment of service lines and apparatus on consumer's premises A 14 29. 06 31. 32. Appeal to Director of Electrical and Mechanical Services 33. Penalty for making addition to electrical installation 34. Penalty on consumer for addition to electrical installation ... 35. Height from ground ... 36. Arc lamps to be guarded 37. Connexion with earth of a three-wire system... Transformers and high pressure apparatus to be inclosed in metal, etc. Connexion to consumer's premises not to he made where undue leakage would result Discontinuance of supply on discovery of leakage on consumer's premises A 14 #14 A 14 A 16 A 16 A 16 A 16 A 16 A 16
2026-05-04 15:37:18 · Baseline
View content

1984 EN OF

VER

UNI

Electricity Supply Regulations

[CAP. 103

A 1

AG

[Subsidiary]

ELECTRICITY SUPPLY REGULATIONS

NG

Regulation

1.

2.

3.

LAW

LIBRARY

Interpretation

ARRANGEMENT OF REGULATIONS

Pressure of supply to consumers

Page

:

A 3

A 4

Introduction of three-wire system into consumer's premises

A 5

4.

Minimum size of conductors

A S

5.

Insulation test of low pressure and medium pressure mains

A 6

6.

Testing of insulation of all parts of high pressure circuit

A 6

7.

Maintenance of insulation

A 6

8.

Circuit-breaker for high pressure mains, etc.

A 6

9.

Transformers

**

A 6

10.

Connexion of transformers with earth

A 6

11.

Protection from lightning

A 7

1

Report of accidents to Director of Electrient- und Mechanical Services-

7

13.

Material of line conductors

+

A 7

14.

Other overhead lines

A 11

15.

Construction of receptacles for electric lines ...

A 12

16.

Crossing pipes, etc.

A 12.

17.

Electric continuity of metal conduits, etc., of high pressure line...

A 12

j

18.

Precautions to be taken when bare conductors are used

A 12

19.

High pressure lines laid above ground or in subways

:

A 12

20.

Protection for surface of ground and electric lines

:

A 12

21.

22.

23.

24.

25.

26.

Completion and control of high pressure lines

Sub-stations

Street boxes

Maximum power in case of underground sub-station, etc.

Responsibility of company for lines, etc., on consumer's premises Fire risks

A 13

:

A 13

:

A 13

A 13

A 14

A 14

27.

Main fuses or circuit-breakers

A 14

28.

Treatment of service lines and apparatus on consumer's premises

A 14

29.

06

31.

32.

Appeal to Director of Electrical and Mechanical Services

33.

Penalty for making addition to electrical installation

34.

Penalty on consumer for addition to electrical installation ...

35.

Height from ground ...

36.

Arc lamps to be guarded

37.

Connexion with earth of a three-wire system...

Transformers and high pressure apparatus to be inclosed in metal, etc. Connexion to consumer's premises not to he made where undue leakage would

result

Discontinuance of supply on discovery of leakage on consumer's premises

A 14

#14

A 14

A 16

A 16

A 16

A 16

A 16

A 16

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.