CAP. 28]

Crown Land Regulations

[1989 Ed.

[Subsidiary]

Item

10.

Pier

11.

12.

Purpose

Playground (including any building permitted thereon)..

Removal permit (for removal of earth, turf or stone)

13. Shipbreaking

14. Slipway

15.

Utility-

(a) Poles (for overhead lines), underground cables and mains

(b) Pylons (for overhead lines) having an envelope area being an area of land used for the base and foundations of the pylon tower including any additional area of land overhung by any structures or fixtures attached to the pylon tower

(c) Any pipeline or cable laid through Government tunnels

Fee

4 of Urban Area Standard Rate

$250 per annum

Variable rate, as determined by the Authority

$10 per ship per day (Minimum fee $250)

of Urban Area Standard Rate

No fee

$10 per sq. metre of pylon envelope area per annum

$6 per 10 mm diameter per metre per annum

(L.N. 32 of 1989)

16.

Vehicle Parking-

(a) Covered

(i) not exceeding 60 m2

(ii) exceeding 60 m2

(b) Open (including any building permitted thereon not exceeding 10 m2)

17. Water Supply (including intakes, pipelines, wells, reservoirs, pumphouses, etc.)-

(a) Agricultural

(b) Domestic, industrial and commercial

18. Works Contract (area occupied in connection with a Public Works Contract)

19. Dumping

4 of Urban Area Standard Rate Urban Area Standard Rate

of Urban Area Standard Rate

(L.N. 320 of 1976)

$20 per annum per installation $100 per annum per installation

No fee

No fee

(L.N. 33 of 1974)

SCHEDULE 2

PART I

NEW TERRITORIES STANDARD RATE

30 cents per sq. metre per annum

[reg. 3]

1

Edit History

2026-05-04 12:49:54 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
A 4 CAP. 28] Crown Land Regulations [1989 Ed. [Subsidiary] Item 10. Pier 11. 12. Purpose Playground (including any building permitted thereon).. Removal permit (for removal of earth, turf or stone) 13. Shipbreaking 14. Slipway 15. Utility- (a) Poles (for overhead lines), underground cables and mains (b) Pylons (for overhead lines) having an envelope area being an area of land used for the base and foundations of the pylon tower including any additional area of land overhung by any structures or fixtures attached to the pylon tower (c) Any pipeline or cable laid through Government tunnels Fee 4 of Urban Area Standard Rate $250 per annum Variable rate, as determined by the Authority $10 per ship per day (Minimum fee $250) of Urban Area Standard Rate No fee $10 per sq. metre of pylon envelope area per annum $6 per 10 mm diameter per metre per annum (L.N. 32 of 1989) 16. Vehicle Parking- (a) Covered (i) not exceeding 60 m2 (ii) exceeding 60 m2 (b) Open (including any building permitted thereon not exceeding 10 m2) 17. Water Supply (including intakes, pipelines, wells, reservoirs, pumphouses, etc.)- (a) Agricultural (b) Domestic, industrial and commercial 18. Works Contract (area occupied in connection with a Public Works Contract) 19. Dumping 4 of Urban Area Standard Rate Urban Area Standard Rate of Urban Area Standard Rate (L.N. 320 of 1976) $20 per annum per installation $100 per annum per installation No fee No fee (L.N. 33 of 1974) SCHEDULE 2 PART I NEW TERRITORIES STANDARD RATE 30 cents per sq. metre per annum [reg. 3] 1
Baseline (Original)
A 4 CAP. 28] Crown Land Regulations [1989 Ed. [Subsidiary] Item 10. Pier 11. 12. Purpose Playground (including any building permitted thereon).. Removal permit (for removal of earth, turf or stone) 13. Shipbreaking 14. Slipway 15. Utility- (a) Poles (for overhead lines), underground cables and mains (b) Pylons (for overhead lines) having an envelope area being an area of land used for the base and foundations of the pylon tower including any additional area of land overhung by any structures or fixtures attached to the pylon tower (c) Any pipeline or cable laid through Government tunnels Fee 4 of Urban Area Standard Rate $250 per annum Variable rate, as determined by the Authority $10 per ship per day (Minimum fee $250) of Urban Area Standard Rate No fee $10 per sq. metre of pylon envelope area per annum $6 per 10 mm diameter per metre per annum (L.N. 32 of 1989) 16. Vehicle Parking- (a) Covered (i) not exceeding 60 m2 (ii) exceeding 60 m2 (b) Open (including any building permitted thereon not exceeding 10 m2) 17. Water Supply (including intakes, pipelines, wells, reservoirs, pumphouses, etc.)- (a) Agricultural (b) Domestic, industrial and commercial 18. Works Contract (area occupied in connection with a Public Works Contract) 19. Dumping 4 of Urban Area Standard Rate Urban Area Standard Rate of Urban Area Standard Rate (L.N. 320 of 1976) $20 per annum per installation $100 per annum per installation No fee No fee (L.N. 33 of 1974) SCHEDULE 2 PART I NEW TERRITORIES STANDARD RATE 30 cents per sq. metre per annum [reg. 3] 1
2026-05-04 12:49:54 · Baseline
View content

A 4

CAP. 28]

Crown Land Regulations

[1989 Ed.

[Subsidiary]

Item

10.

Pier

11.

12.

Purpose

Playground (including any building permitted thereon)..

Removal permit (for removal of earth, turf or stone)

13. Shipbreaking

14. Slipway

15.

Utility-

(a) Poles (for overhead lines), underground cables and

mains

(b) Pylons (for overhead lines) having an envelope area being an area of land used for the base and foundations of the pylon tower including any additional area of land overhung by any structures or fixtures attached to the pylon tower

(c) Any pipeline or cable laid through Government

tunnels

Fee

4 of Urban Area Standard Rate

$250 per annum

Variable rate, as determined by

the Authority

$10 per ship per day (Minimum

fee $250)

of Urban Area Standard Rate

No fee

$10 per sq. metre of pylon

envelope area per annum

$6 per 10 mm diameter per metre

per annum

(L.N. 32 of 1989)

16.

Vehicle Parking-

(a) Covered

(i) not exceeding 60 m2

(ii) exceeding 60 m2

(b) Open (including any building permitted thereon not

exceeding 10 m2)

17. Water Supply (including intakes, pipelines, wells,

reservoirs, pumphouses, etc.)-

(a) Agricultural

(b) Domestic, industrial and commercial

18. Works Contract (area occupied in connection with a

Public Works Contract)

19. Dumping

4 of Urban Area Standard Rate Urban Area Standard Rate

of Urban Area Standard Rate

(L.N. 320 of 1976)

$20 per annum per installation $100 per annum per installation

No fee

No fee

(L.N. 33 of 1974)

SCHEDULE 2

PART I

NEW TERRITORIES STANDARD RATE

30 cents per sq. metre per annum