A 4
CAP. 28]
Crown Land Regulations
[1989 Ed.
[Subsidiary]
Item
10.
Pier
11.
12.
Purpose
Playground (including any building permitted thereon)..
Removal permit (for removal of earth, turf or stone)
13. Shipbreaking
14. Slipway
15.
Utility-
(a) Poles (for overhead lines), underground cables and mains
(b) Pylons (for overhead lines) having an envelope area being an area of land used for the base and foundations of the pylon tower including any additional area of land overhung by any structures or fixtures attached to the pylon tower
(c) Any pipeline or cable laid through Government tunnels
Fee
4 of Urban Area Standard Rate
$250 per annum
Variable rate, as determined by the Authority
$10 per ship per day (Minimum fee $250)
of Urban Area Standard Rate
No fee
$10 per sq. metre of pylon envelope area per annum
$6 per 10 mm diameter per metre per annum
(L.N. 32 of 1989)
16.
Vehicle Parking-
(a) Covered
(i) not exceeding 60 m2
(ii) exceeding 60 m2
(b) Open (including any building permitted thereon not exceeding 10 m2)
17. Water Supply (including intakes, pipelines, wells, reservoirs, pumphouses, etc.)-
(a) Agricultural
(b) Domestic, industrial and commercial
18. Works Contract (area occupied in connection with a Public Works Contract)
19. Dumping
4 of Urban Area Standard Rate Urban Area Standard Rate
of Urban Area Standard Rate
(L.N. 320 of 1976)
$20 per annum per installation $100 per annum per installation
No fee
No fee
(L.N. 33 of 1974)
SCHEDULE 2
PART I
NEW TERRITORIES STANDARD RATE
30 cents per sq. metre per annum
[reg. 3]
1
A 4
CAP. 28]
Crown Land Regulations
[1989 Ed.
[Subsidiary]
Item
10.
Pier
11.
12.
Purpose
Playground (including any building permitted thereon)..
Removal permit (for removal of earth, turf or stone)
13. Shipbreaking
14. Slipway
15.
Utility-
(a) Poles (for overhead lines), underground cables and
mains
(b) Pylons (for overhead lines) having an envelope area being an area of land used for the base and foundations of the pylon tower including any additional area of land overhung by any structures or fixtures attached to the pylon tower
(c) Any pipeline or cable laid through Government
tunnels
Fee
4 of Urban Area Standard Rate
$250 per annum
Variable rate, as determined by
the Authority
$10 per ship per day (Minimum
fee $250)
of Urban Area Standard Rate
No fee
$10 per sq. metre of pylon
envelope area per annum
$6 per 10 mm diameter per metre
per annum
(L.N. 32 of 1989)
16.
Vehicle Parking-
(a) Covered
(i) not exceeding 60 m2
(ii) exceeding 60 m2
(b) Open (including any building permitted thereon not
exceeding 10 m2)
17. Water Supply (including intakes, pipelines, wells,
reservoirs, pumphouses, etc.)-
(a) Agricultural
(b) Domestic, industrial and commercial
18. Works Contract (area occupied in connection with a
Public Works Contract)
19. Dumping
4 of Urban Area Standard Rate Urban Area Standard Rate
of Urban Area Standard Rate
(L.N. 320 of 1976)
$20 per annum per installation $100 per annum per installation
No fee
No fee
(L.N. 33 of 1974)
SCHEDULE 2
PART I
NEW TERRITORIES STANDARD RATE
30 cents per sq. metre per annum
[reg. 3]
1
No comments yet.
Private notes are available after approval.