B 8
[Subsidiary]
L.N. 267/84.
L.N. 267/84.
L.N. 172/79. L.N. 267/84.
(Cap. 374, sub. leg.)
L.N. 267/84.
L.N. 267/84.
(Cap. 374, sub. leg.)
L.N. 172/79.
L.N. 172/79.
CAP. 203]
Cross-Harbour Tunnel By-laws
[1984 Ed.
(ca) a vehicle, other than a trailer, the load of which extends forwards more than 1.5 m from the foremost part of the vehicle:
(cb) a vehicle the load of which extends backwards more than 1.4 m behind the rearmost part of the vehicle;
(d) a vehicle with a wheel-load exceeding 4.5 tonnes or an axle load exceeding 11 tonnes;
(da) a vehicle or trailer in respect of which a permit is issued under regulation 53(1) of the Road Traffic (Registration and Licensing of Vehicles) Regulations;
(e) a vehicle the width of which (including load) exceeds 2.5 m;
and
(f) a vehicle for which no toll is prescribed under section 40(2) or 41(5) of the Ordinance;
(g) a vehicle of any class the gross vehicle weight of which exceeds the permitted gross vehicle weight for a vehicle of that class specified in the Second Schedule to the Road Traffic (Construction and Maintenance of Vehicles) Regulations.
(2) A person requiring a permit under paragraph (1) may apply therefor to the Tunnel Manager in writing giving details of the vehicle or trailer and its load, if any, and the time, date and direction of its proposed passage through the tunnel.
(3) Where an application for a permit is made under paragraph (2) in respect of a vehicle or trailer referred to in paragraph (1)(da) such application shall, if required by the Tunnel Manager, be accompanied by such civil engineering advice or other information relating to the vehicle or trailer as may be specified by the Tunnel Manager,
(4) Except where the Tunnel Manager waives the requirement in this paragraph of a prior notice, an application for a permit under paragraph (2) shall be made at least 2 days before the proposed passage of the vehicle or trailer through the tunnel.
(5) The Tunnel Manager may specify in a permit issued under this by-law--
(a) the date and time for the passage of the vehicle or trailer through the tunnel; and
(b) such other conditions as the Tunnel Manager thinks fit.
(6) The following fee shall be payable to the Company for the issue of a permit under this by-law-
(a) for a permit in respect of a vehicle referred to in paragraph (1)(a), (b), (c), (d), (e) or (f)
(b) for a permit in respect of a vehicle or trailer referred to in paragraph (1)(da)
$50; and
$500.
B 8
[Subsidiary]
L.N. 267/84.
L.N. 267/84.
L.N. 172/79. L.N. 267/84.
(Cap. 374, sub. leg.)
L.N. 267/84.
L.N. 267/84.
(Cap. 374, sub. leg.)
L.N. 172/79.
L.N. 172/79.
CAP. 203]
Cross-Harbour Tunnel By-laws
[1984 Ed.
(ca) a vehicle, other than a trailer, the load of which extends forwards more than 1.5 m from the foremost part of the vehicle:
(cb) a vehicle the load of which extends backwards more than
1.4 m behind rearmost part of the vehicle;
(d) a vehicle with a wheel-load exceeding 4.5 tonnes or an axle
load exceeding 11 tonnes;
(da) a vehicle or trailer in respect of which a permit is issued under regulation 53(1) of the Road Traffic (Registration and Licensing of Vehicles) Regulations;
(e) a vehicle the width of which (including load) exceeds 2.5 m;
and
(f) a vehicle for which no toll is prescribed under section 40(2)
or 41(5) of the Ordinance;
(g) a vehicle of any class the gross vehicle weight of which exceeds the permitted gross vehicle weight for a vehicle of that class specified in the Second Schedule to the Road Traffic (Construction and Maintenance of Vehicles) Regulations.
(2) A person requiring a permit under paragraph (1) may apply therefor to the Tunnel Manager in writing giving details of the vehicle or trailer and its load, if any, and the time, date and direction of its proposed passage through the tunnel.
(3) Where an application for a permit is made under para- graph (2) in respect of a vehicle or trailer referred to in paragraph (1)(da) such application shall, if required by the Tunnel Manager, be accompanied by such civil engineering advice or other information relating to the vehicle or trailer as may be specified by the Tunnel Manager,
(4) Except where the Tunnel Manager waives the requirement in this paragraph of a prior notice, an application for a permit under paragraph (2) shall be made at least 2 days before the proposed passage of the vehicle or trailer through the tunnel.
(5) The Tunnel Manager may specify in a permit issued under this by-law--
(a)
the date and time for the passage of the vehicle or trailer through the tunnel; and
(b) such other conditions as the Tunnel Manager thinks fit.
(6) The following fee shall be payable to the Company for the
issue of a permit under this by-law-
(a) for a permit in respect of a vehicle referred to in
paragraph (1)(a), (b), (c), (d), (e) or (ƒ)
(b) for a permit in respect of a vehicle or trailer
referred to in paragraph (1)(da)
$50; and
$500.
i
No comments yet.
Private notes are available after approval.