1985 Ed.]
Building (Construction) Regulations
[CAP. 123
B 25
English and Chinese incised or embossed, of metal, plastic or other suitable material, in letters and figures not less than 15 mm high, stating the imposed load for which the floor has been designed, in the following form---
[Subsidiary]
BUILDINGS ORDINANCE
(Chapter 123)
NOTICE
The imposed load on this floor is not to exceed
kilograms per square metre.
建築物條例
(香港法例第123章)
告示
此樓面之活載重量每平方米不得超過
千克
(2) Where floors of different rooms or different parts of floors have been designed for different imposed loads, a notice in the form in paragraph (1) shall be suitably displayed in each room or on each part of the floor, as the case may be, indicating the variations.
PART IIIA
SITE FORMATION WORKS
27A. (1) Site formation works shall be designed and constructed so that during construction and thereafter there is an adequate margin of safety of the works and the remainder of the site.
(2) The carrying out of site formation works shall not render inadequate the margin of safety of, or cause damage to, any building, structure or land.
PART IIIB
BULK EXCAVATION
27B. Bulk excavation in the scheduled area shall not be carried out below levels to be determined by the Building Authority.
PART IIIC
GROUND INVESTIGATION
27C. All ground investigation in the scheduled area shall be designed and carried out to the satisfaction of the Building Authority.
L.N. 76/81.
Site formation works.
L.N. 234/82.
Bulk excavation in scheduled area.
L.N. 134/82.
52/90513
Ground investigation in scheduled area.
Page 25
Page 26
1985 Ed.]
Building (Construction) Regulations
[CAP. 123
B 25
English and Chinese incised or embossed, of metal, plastic or other suitable material, in letters and figures not less than 15 mm high, stating the imposed load for which the floor has been designed, in the following form---
[Subsidiary]
BUILDINGS ORDINANCE
(Chapter 123)
NOTICE
The imposed load on this floor is not to exceed
kilograms per square metre.
建築物條例
(香港法例第
章)
告示
此樓面之活載重量 每平方米不得超過
千克
(2) Where floors of different rooms/or different parts of floors
have been designed for different imposed loads, a notice in the form in paragraph (1) shall be suitably displayed in each room or on each part of the floor, as the case may be, indicating the variations.
PART IIIA
SITE FORMATION WORKS
27A. (1) Site formation works shall be designed and con- structed so that during construction and thereafter there is an adequate margin of safety of the works and the remainder of the site.
(2) The carrying out of site formation works shall not render inadequate the margin of safety of, or cause damage to, any building, structure or land.
PART IIIB
BULK EXCAVATION
27B. Bulk excavation in,the scheduled area shall not be carried out below levels to be determined by the Building Authority.
PART IIIC
GROUND INVESTIGATION
27C. All ground investigation in the scheduled area shall be designed and carried out to the satisfaction of the Building Authority.
L.N. 76/81.
Site formation
works.
L.N. 234/82.
Bulk excavation in scheduled
area.
L.N. 134/82.
52/90513
Ground investigation in scheduled area.
Page 25Page 26
No comments yet.
Private notes are available after approval.