Building (Administration) Regulations
|CAP. 123
A 9
(bb) a site formation plan showing-
(i) all site formation works and associated surface water drainage works incorporating the requirements of the report prescribed in sub-sub-paragraph (E);
(ii) the existing nature of the site and the surrounds (including accurate survey plan with ground level contours, geological conditions, groundwater conditions and surface water conditions) and particulars of structures, foundations, public utilities, drains and sewers and other services on and adjacent to the site;
(iii) safety precautions to be taken whilst carrying out the building works during periods of heavy rainfall;
(iv) a schedule of the geotechnical design assumptions;
(v) the sequence of the building works and methods to be employed;
(vi) if so required by the Building Authority, specifications and any other relevant particulars;
(vii) in the scheduled area, the envelope of all bulk excavation by means of cross-sections and horizontal plan drawings marked up with levels above the Hong Kong Principal Datum,
and the site formation plan shall be accompanied by supporting documentation including-
(A) an explanatory guide to the submission;
(B) a report containing the results of a study including topography, geology, groundwater, surface water, site history, public utilities, drains and sewers and other services, and local geotechnical records;
(C) a report containing the results of ground investigation including comprehensive details of equipment and procedures used;
(D) a report containing the results of site monitoring of groundwater conditions;
(E) a report containing critical examination and interpretation of sub-sub-paragraphs (B), (C) and (D), a schedule of the geotechnical design assumptions, discussion of anticipated geotechnical problems and an outline of variations of the works which should be adopted if, during the carrying out of the building works, a geotechnical design assumption is revealed as being erroneous so that compliance with regulation 274 of the Building (Construction) Regulations could no longer be demonstrated and containing geotechnical requirements for the design and construction of the site formation works including testing, inspecting and maintenance requirements;
(F) stability analyses sufficient to demonstrate compliance with regulation 27A of the Building (Construction) Regulations; design calculations for site formation works;
[Subsidiary]
L.N. 233/82.
L.N. 233/82.
L.N. 233/83.
(Cap. 123. sub. leg.)
1985 Ed.]
Building (Administration) Regulations
|CAP. 123
A 9
(bb) a site formation plan showing-
(i) all site formation works and associated surfacewater drainage works incorporating the requirements of the report prescribed in sub-sub-paragraph (E);
(ii) the existing nature of the site and the surrounds (including accurate survey plan with ground level con- tours, geological conditions, groundwater conditions and surfacewater conditions) and particulars of structures, foundations, public utilities, drains and sewers and other services on and adjacent to the site;
(iii) safety precautions to be taken whilst carrying out the building works during periods of heavy rainfall;
(iv) a schedule of the geotechnical design assumptions; (v) the sequence of the building works and methods to be employed;
(vi) if so required by the Building Authority, specifica- tions and any other relevant particulars;
(vii) in the scheduled area, the envelope of all bulk excavation by means of cross-sections and horizontal plan drawings marked up with levels above the Hong Kong Principal Datum,
and the site formation plan shall be accompanied by supporting documentation including-
(A) an explanatory guide to the submission;
(B) a report containing the results of a study including topography, geology, groundwater, surfacewater, site his- tory, public utilities, drains and sewers and other services, and local geotechnical records;
(C) a report containing the results of ground investiga- tion including comprehensive details of equipment and procedures used;
(D) a report containing the results of site monitoring of groundwater conditions;
(E) a report containing critical examination and inter- pretation of sub-sub-paragraphs (B). (C) and (D), a schedule of the geotechnical design assumptions, discus- sion of anticipated geotechnical problems and an outline of variations of the works which should be adopted if, during the carrying out of the building works, a geotechni- cal design assumption is revealed as being erroneous so that compliance with regulation 274 of the Building (Con- struction) Regulations could no longer be demonstrated and containing geotechnical requirements for the design and construction of the site formation works including testing, inspecting and maintenance requirements;
(F) stability analyses sufficient to demonstrate com- pliance with regulation 27A of the Building (Construction) Regulations; design calculations for site formation works;
[Subsidiary]
L.N. 233/82.
L.N. 233/82.
L.N. 233/83.
(Cap. 123. sub. leg.)