F 46
CAP. 311]
Air Pollution Control (Specified Processes) Regulations
[1987 Ed.
[Subsidiary]
PART B (Process Description):
Hereunder is the brief description of the process to be conducted in the premises mentioned in Part A of this record. A more exact description of the process is contained in a notice given to the Authority containing such particulars and information as specified in an order published in the Gazette in accordance with section 19(1) of the Air Pollution Control Ordinance.
1.
2.
Classification of specified process: Installed/Processing* Capacity:
Silo Capacity (for Cement Works only):
3.
4.
Fuel Usage:
Fuel to be Used Consumption Rate Discharge Point No. Ash Type Content Sulphur Content Other Specifications Maximum Normal
5.
Raw Materials and Products:
Raw Materials Usage Product Production Type Nature or General Composition Consumption Rate Production Rate Annual Use Annual Production Normal Maximum Normal Maximum
6.
Other Particulars:
PART C (Terms and Conditions):
19........
The Authority has imposed by notice in writing to the exemption holder on the day of
in relation to this exemption terms and conditions in accordance with section 22 of the Ordinance. This exemption shall continue in force subject to the observance of the terms and conditions which are contained in the said notice and reproduced below:
(Hereunder insert the terms and conditions in relation to this exemption- section 22 of the Air Pollution Control Ordinance)
* Delete if not applicable.
Page 45
Page 46
F 46
CAP. 311]
Air Pollution Control (Specified Processes) Regulations
[1987 Ed.
[Subsidiary]
PART B (Process Description):
Hereunder is the brief description of the process to be conducted in the premises mentioned in Part A of this record. A more exact description of the process is contained in a notice given to the Authority containing such particulars and information as specified in an order published in the Gazette in accordance with section 19(1) of the Air Pollution Control Ordinance.
1.
2.
Classification of specified process: Installed/Processing* Capacity:
Silo Capacity (for Cement Works only):
3.
4.
Fuel Usage:
Fuel to be Used
Consumption Rate
Discharge
Point No.
Ash
Type
Content
Sulphur Content
Other Specifications
Maximum Normal
5.
Raw Materials and Products:
Raw Materials Usage
Product Production
Type
Nature or General Composition
Consumption Rate
Production Rate
Annual Use
Annual Production
Normal Maximum
Normal Maximum
6.
Other Particulars:
PART C (Terms and Conditions):
19........
The Authority has imposed by notice in writing to the exemption holder on the
day of
in relation to this exemption terms and conditions in accordance with section 22 of the Ordinance. This exemption shall continue in force subject to the observance of the terms and conditions which are contained in the said notice and reproduced below:
(Hereunder insert the terms and conditions in relation to this exemption- section 22 of the Air Pollution Control Ordinance)
* Delete if not applicable.
Page 45Page 46
No comments yet.
Private notes are available after approval.