1964_AIR_POLLUTION_CONTROL_(SPECIFIED_PROCESSES)_REGULATIONS — Page 27

HK Historical Laws 香港歷史法例 All AI Reviewed

F 28

CAP. 311]

Air Pollution Control (Specified Processes) Regulations

[1987 Ed.

[Subsidiary]

(4) Fuel Usage, Raw Materials, Products and Processes/Equipment

Describe the details of proposed variation in respect to the fuel usage, raw materials, products and processes/equipment described for the purpose of the existing licence or exemption and state what action, if any, is proposed to minimize the amount or effects of any air pollution.

Please provide, wherever applicable,

(1) A block plan, drawn to a scale of 1:500 and prepared by an authorized person, showing the buildings and topography surrounding the premises where the specified process is to be conducted and the location of all emission points and their corresponding numbers.

(2) Schematic diagrams of process flow prepared by a qualified engineer, showing the flow of materials, including raw materials, materials in process of manufacture, manufactured materials, by-products and waste materials. All emission points and processes/equipment, including air pollution control equipment, associated with each emission point, must be identified and labelled with consistent reference numbers.

7. Notes

(1) The Authority may require the applicant to submit any other information about the specified process under application as specified in a notice in writing served by the Authority in accordance with section 27 of the Air Pollution Control Ordinance within such time and in such form as is specified in the same notice.

(2) This application is subject to public notification provision pursuant to section 14 of the Air Pollution Control Ordinance. The applicant, however, may apply to withhold any information contained in this application from public notification to the extent as permitted under section 40 of the Ordinance.

(3) The expense in public notification in causing a notice to be published in an English language and a Chinese language newspaper shall be met by the applicant himself.

(4) The Authority may grant the application, with or without modification, or refuse to grant it but shall not do so earlier than 30 or 40 days, respectively for variation or cancellation of any term or condition of exemption and variation of a licence, after the last notice is published in a newspaper.

(5) The prescribed fee for application is NOT refundable.

(6) Any person who provides information which he knows to be incorrect in a material respect or recklessly makes any statement which is incorrect in a material respect or knowingly omits any material particular commits an offence and is liable to a fine of $5,000.

6.

Drawings

Edit History

2026-05-04 02:32:04 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
F 28 CAP. 311] Air Pollution Control (Specified Processes) Regulations [1987 Ed. [Subsidiary] (4) Fuel Usage, Raw Materials, Products and Processes/Equipment Describe the details of proposed variation in respect to the fuel usage, raw materials, products and processes/equipment described for the purpose of the existing licence or exemption and state what action, if any, is proposed to minimize the amount or effects of any air pollution. Please provide, wherever applicable, (1) A block plan, drawn to a scale of 1:500 and prepared by an authorized person, showing the buildings and topography surrounding the premises where the specified process is to be conducted and the location of all emission points and their corresponding numbers. (2) Schematic diagrams of process flow prepared by a qualified engineer, showing the flow of materials, including raw materials, materials in process of manufacture, manufactured materials, by-products and waste materials. All emission points and processes/equipment, including air pollution control equipment, associated with each emission point, must be identified and labelled with consistent reference numbers. 7. Notes (1) The Authority may require the applicant to submit any other information about the specified process under application as specified in a notice in writing served by the Authority in accordance with section 27 of the Air Pollution Control Ordinance within such time and in such form as is specified in the same notice. (2) This application is subject to public notification provision pursuant to section 14 of the Air Pollution Control Ordinance. The applicant, however, may apply to withhold any information contained in this application from public notification to the extent as permitted under section 40 of the Ordinance. (3) The expense in public notification in causing a notice to be published in an English language and a Chinese language newspaper shall be met by the applicant himself. (4) The Authority may grant the application, with or without modification, or refuse to grant it but shall not do so earlier than 30 or 40 days, respectively for variation or cancellation of any term or condition of exemption and variation of a licence, after the last notice is published in a newspaper. (5) The prescribed fee for application is NOT refundable. (6) Any person who provides information which he knows to be incorrect in a material respect or recklessly makes any statement which is incorrect in a material respect or knowingly omits any material particular commits an offence and is liable to a fine of $5,000. 6. Drawings
Baseline (Original)
F 28 CAP. 311] Processes) Regulations Air Pollution Control (Specified [1987 Ed. [Subsidiary] (4) Fuel Usage, Raw Materials, Products and Processes/Equipment Describe the details of proposed variation in respect to the fuel usage, raw materials, products and processes/equipment described for the purpose of the existing licence or exemption and state what action, if any, is proposed to minimize the amount or effects of any air pollution. Please provide, wherever applicable, (1) A block plan, drawn to a scale of 1:500 and prepared by an authorized person, showing the buildings and topography surrounding the premises where the specified process is to be conducted and the location of all emission points and their corresponding numbers. (2) Schematic diagrams of process flow prepared by a qualified engineer, showing the flow of materials, including raw materials, materials in process of manufacture, manufactured materials, by-products and waste materials. All emission points and processes/equipment, including air pollution control equipment, associated with each emission point, must be identified and labelled with consistent reference numbers. 7. Notes (1) The Authority may require the applicant to submit any other information about the specified process under application as specified in a notice in writing served by the Authority in accordance with section 27 of the Air Pollution Control Ordinance within such time and in such form as is specified in the same notice. (2) This application is subject to public notification provision pursuant to section 14 of the Air Pollution Control Ordinance. The applicant, however, may apply to withhold any information contained in this application from public notification to the extent as permitted under section 40 of the Ordinance. (3) The expense in public notification in causing a notice to be published in an English language and a Chinese language newspaper shall be met by the applicant himself. (4) The Authority may grant the application, with or without modification, or refuse to grant it but shall not do so earlier than 30 or 40 days, respectively for variation or cancellation of any term or condition of exemption and variation of a licence, after the last notice is published in a newspaper. (5) The prescribed fee for application is NOT refundable. (6) Any person who provides information which he knows to be incorrect in a material respect or recklessly makes any statement which is incorrect in a material respect or knowingly omits any material particular commits an offence and is liable to a fine of $5,000. 6. Drawings
2026-05-04 02:32:04 · Baseline
View content

F 28

CAP. 311]

Processes) Regulations Air Pollution Control (Specified

[1987 Ed.

[Subsidiary]

(4) Fuel Usage, Raw Materials, Products and Processes/Equipment

Describe the details of proposed variation in respect to the fuel usage, raw materials, products and processes/equipment described for the purpose of the existing licence or exemption and state what action, if any, is proposed to minimize the amount or effects of any air pollution.

Please provide, wherever applicable,

(1) A block plan, drawn to a scale of 1:500 and prepared by an authorized person, showing the buildings and topography surrounding the premises where the specified process is to be conducted and the location of all emission points and their corresponding numbers. (2) Schematic diagrams of process flow prepared by a qualified engineer, showing the flow of materials, including raw materials, materials in process of manufacture, manufactured materials, by-products and waste materials. All emission points and processes/equipment, including air pollution control equipment, associated with each emission point, must be identified and labelled with consistent reference numbers.

7. Notes

(1) The Authority may require the applicant to submit any other information about the specified process under application as specified in a notice in writing served by the Authority in accordance with section 27 of the Air Pollution Control Ordinance within such time and in such form as is specified in the same notice.

(2) This application is subject to public notification provision pursuant to section 14 of the Air Pollution Control Ordinance. The applicant, however, may apply to withhold any information contained in this application from public notification to the extent as permitted under section 40 of the Ordinance. (3) The expense in public notification in causing a notice to be published in an English language and a Chinese language newspaper shall be met by the applicant himself. (4) The Authority may grant the application, with or without modification, or refuse to grant it but shall not do so earlier than 30 or 40 days, respectively for variation or cancellation of any term or condition of exemption and variation of a licence, after the last notice is published in a newspaper.

(5) The prescribed fee for application is NOT refundable.

(6) Any person who provides information which he knows to be incorrect in a material respect or recklessly makes any statement which is incorrect in a material respect or knowingly omits any material particular commits an offence and is liable to a fine of $5,000.

6.

Drawings

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.