1964_AERIAL_ROPEWAYS_(OPERATION_AND_MAINTENANCE)_REGULATIONS — Page 20

HK Historical Laws 香港歷史法例 All AI Reviewed

1981 Ed.]

Aerial Ropeways (Operation and Maintenance) Regulations

[CAP. 211

A 19

(2) Subject to paragraph (3), any owner of an aerial ropeway who contravenes paragraph (1) commits an offence (whether or not any other person is also convicted of the offence) and is liable-

(a) where the contravention relates to any of the regulations set out in regulation 39, to the penalty set out in the 2nd, 3rd and 4th columns of Part IV of the Third Schedule opposite the reference to that regulation in the 1st column thereof; and

(b) where the contravention relates to any of the regulations set out in regulation 40, to the penalty set out in the 2nd, 3rd and 4th columns of Part V of the Third Schedule opposite the reference to that regulation in the 1st column thereof.

(3) The owner of an aerial ropeway shall not be convicted of an offence under paragraph (2) if he satisfies the court that he took all such precautions to prevent the non-compliance as the court considers reasonable in the circumstances.

[Subsidiary]

Third Schedule.

Third Schedule.

FIRST SCHEDULE

FEES

1. Application for approval under regulation 4 as---

(a) a surveyor

(b) a competent person

(c) a controller

(d) an operator

{regs. 4 & 5(7).]

Fee

$1,200

$250

$225

$100

$150

2. Application under regulation 5(7) by an operator holding a limited certificate

*

SECOND SCHEDULE

CONTENTS OF FIRST AID BOXES

[reg. 37.]

(a) A copy of a leaflet issued by the Director of Medical and Health Services giving advice on first-aid treatment.

(b) A sufficient number of small sterilized unmedicated dressings for injured fingers.

(c) A sufficient number of medium-sized sterilized unmedicated dressings for injured hands or feet.

(d) A sufficient number of large sterilized unmedicated dressings for other injured parts of the body.

(e) A sufficient number of waterproof adhesive wound dressings of assorted sizes.

(f) A sufficient number of triangular bandages of unbleached calico, the longest side of each bandage measuring not less than 54 inches and each of the other sides of each bandage measuring not less than 36 inches.

(g) A sufficient supply of rolls of zinc oxide adhesive plaster, each roll to be at least 5 yards by 1 inch.

(h) A sufficient number of ounce packets of absorbent cotton wool.

(i) A pressure bandage.

(j) A sufficient number of safety pins.

Page 20

Page 21

Edit History

2026-05-04 02:17:52 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
1981 Ed.] Aerial Ropeways (Operation and Maintenance) Regulations [CAP. 211 A 19 (2) Subject to paragraph (3), any owner of an aerial ropeway who contravenes paragraph (1) commits an offence (whether or not any other person is also convicted of the offence) and is liable- (a) where the contravention relates to any of the regulations set out in regulation 39, to the penalty set out in the 2nd, 3rd and 4th columns of Part IV of the Third Schedule opposite the reference to that regulation in the 1st column thereof; and (b) where the contravention relates to any of the regulations set out in regulation 40, to the penalty set out in the 2nd, 3rd and 4th columns of Part V of the Third Schedule opposite the reference to that regulation in the 1st column thereof. (3) The owner of an aerial ropeway shall not be convicted of an offence under paragraph (2) if he satisfies the court that he took all such precautions to prevent the non-compliance as the court considers reasonable in the circumstances. [Subsidiary] Third Schedule. Third Schedule. FIRST SCHEDULE FEES 1. Application for approval under regulation 4 as--- (a) a surveyor (b) a competent person (c) a controller (d) an operator {regs. 4 & 5(7).] Fee $1,200 $250 $225 $100 $150 2. Application under regulation 5(7) by an operator holding a limited certificate * SECOND SCHEDULE CONTENTS OF FIRST AID BOXES [reg. 37.] (a) A copy of a leaflet issued by the Director of Medical and Health Services giving advice on first-aid treatment. (b) A sufficient number of small sterilized unmedicated dressings for injured fingers. (c) A sufficient number of medium-sized sterilized unmedicated dressings for injured hands or feet. (d) A sufficient number of large sterilized unmedicated dressings for other injured parts of the body. (e) A sufficient number of waterproof adhesive wound dressings of assorted sizes. (f) A sufficient number of triangular bandages of unbleached calico, the longest side of each bandage measuring not less than 54 inches and each of the other sides of each bandage measuring not less than 36 inches. (g) A sufficient supply of rolls of zinc oxide adhesive plaster, each roll to be at least 5 yards by 1 inch. (h) A sufficient number of ounce packets of absorbent cotton wool. (i) A pressure bandage. (j) A sufficient number of safety pins. Page 20 Page 21
Baseline (Original)
1981 Ed.] Aerial Ropeways (Operation and Maintenance) Regulations [CAP. 211 A 19 (2) Subject to paragraph (3), any owner of an aerial ropeway who contravenes paragraph (1) commits an offence (whether or not any other person is also convicted of the offence) and is liable- (a) where the contravention relates to any of the regulations set out in regulation 39, to the penalty set out in the 2nd, 3rd and 4th columns of Part IV of the Third Schedule opposite the reference to that regulation in the 1st column thereof; and (b) where the contravention relates to any of the regulations set out in regulation 40, to the penalty set out in the 2nd, 3rd and 4th columns of Part V of the Third Schedule opposite the reference to that regulation in the 1st column thereof. (3) The owner of an aerial ropeway shall not be convicted of an offence under paragraph (2) if he satisfies the court that he took all such precautions to prevent the non-compliance as the court considers reasonable in the circumstances. [Subsidiary] Third Schedule. Third Schedule. FIRST SCHEDULE FEES 1. Application for approval under regulation 4 as--- (a) a surveyor (b) a competent person (c) a controller (d) an operator {regs. 4 & 5(7).] Fee $1.200 $ 250 $ 225 S 100 $ 150 2. Application under regulation 5(7) by an operator holding a limited certificate * SECOND SCHEDULE CONTENTS OF FIRST AID BOXES [reg. 37.] INTER (a) A copy of a leaflet issued by the Director of Medieal-and Health Services giving advice on first-aid treatment. (b) A sufficient number of small sterilized unmedicated dressings for injured fingers. (c) A sufficient number of medium-sized sterilized unmedicated dressings for injured hands or feet. (d) A sufficient number of large sterilized unmedicated dressings for other injured parts of the body. (e) A sufficient number of waterproof adhesive wound dressings of assorted sizes. (f) A sufficient number of triangular bandages of unbleached calico, the longest side of each bandage measuring not less than 54-inches and each of the other sides of each bandage measuring not less than 36-inches.foc mdlbmaturg (g) A sufficient supply of rolls of zinc oxide adhesive plaster, each roll to be at least 5 yards by inch. 4.5maluse by as milimetres (h) A sufficient number of ounce packets of absorbent cotton wool. (i) A pressure bandage. () A sufficient number of safety pins. Page 20Page 21
2026-05-04 02:17:52 · Baseline
View content

1981 Ed.]

Aerial Ropeways (Operation and Maintenance) Regulations

[CAP. 211

A 19

(2) Subject to paragraph (3), any owner of an aerial ropeway who contravenes paragraph (1) commits an offence (whether or not any other person is also convicted of the offence) and is liable-

(a) where the contravention relates to any of the regulations set out in regulation 39, to the penalty set out in the 2nd, 3rd and 4th columns of Part IV of the Third Schedule opposite the reference to that regulation in the 1st column thereof; and

(b) where the contravention relates to any of the regulations set out in regulation 40, to the penalty set out in the 2nd, 3rd and 4th columns of Part V of the Third Schedule opposite the reference to that regulation in the 1st column thereof.

(3) The owner of an aerial ropeway shall not be convicted of an offence under paragraph (2) if he satisfies the court that he took all such precautions to prevent the non-compliance as the court considers reasonable in the circumstances.

[Subsidiary]

Third Schedule.

Third Schedule.

FIRST SCHEDULE

FEES

1. Application for approval under regulation 4 as---

(a) a surveyor

(b) a competent person

(c) a controller

(d) an operator

{regs. 4 & 5(7).]

Fee

$1.200

$ 250

$ 225

S 100

$ 150

2. Application under regulation 5(7) by an operator holding a limited

certificate

*

SECOND SCHEDULE

CONTENTS OF FIRST AID BOXES

[reg. 37.]

INTER

(a) A copy of a leaflet issued by the Director of Medieal-and Health Services

giving advice on first-aid treatment.

(b) A sufficient number of small sterilized unmedicated dressings for injured

fingers.

(c) A sufficient number of medium-sized sterilized unmedicated dressings for

injured hands or feet.

(d) A sufficient number of large sterilized unmedicated dressings for other

injured parts of the body.

(e) A sufficient number of waterproof adhesive wound dressings of assorted

sizes.

(f) A sufficient number of triangular bandages of unbleached calico, the longest side of each bandage measuring not less than 54-inches and each of the other sides of each bandage measuring not less than 36-inches.foc mdlbmaturg (g) A sufficient supply of rolls of zinc oxide adhesive plaster, each roll to be at

least 5 yards by inch. 4.5maluse by as milimetres

(h) A sufficient number of ounce packets of absorbent cotton wool.

(i) A pressure bandage.

() A sufficient number of safety pins.