9. When the Promoter has opened or broken up any Completion portion of any road, he shall be under the following of works, further obligations, namely :--

and reins- tatement of

1. He shall, with all convenient speed complete the road. work on account of which he opened or broke up the same, and (subject to the formation, mainten- ance, renewal, or alteration of, addition to, or removal of the tramway) fill in the ground, and make good the surface, and, to the satisfaction of the Director of Public Works, restore the roud ro a good condition,

2. He shall in the meantime cause the place where the road is opened or broken up to be fenced and watched, and to be properly lighted at night. If the Promoter fails to comply with any of the provisions of this section, he shall for every offence (without pre- judice to the enforcement of specific performance of the requirements of this Ordinance or to any other remedy against him) be liable on summary conviction to a penalty not exceeding one hundred dollars, and to a further penalty not exceeding twenty-five dollars for every day during which any such failure continues after the first day on which such penalty is incurred.

10. In addition to the requirements of the preceding Further section, the Promoter shall, when he gives notice as afore- provisions as said to the Director of Public Works of his intention to

to construe- tion of

open or break up any road for any of the purposes a foresaid, tramway. [such_plans as the Director of lay before the Director of Public Works [a cross section Public Works may consider showing the proposed mode of constructing, laying down, necessary for showing the maintaining, renewing, altering, adding to, or removing the works proposed to be car- tramway or works in respect of which he proposes to ried out]

[any work]

[plans]

[plans]

open or break up such road, and a statement of the materials intended to be used therein]; and the Promoter shall not commence [the construction, laying down, maintenance, re- newal, alteration of, addition to, or removal of such tramway or works, or any part thereof respectively, except for the purpose of necessary repairs], until such [cross section and statement] have been approved in writing by the Director of Public Works, and the work shall be executed in accordance with such approved [cross section and statement, and under the superintendence] and to the satisfaction of the Director of Public Works.

which tra

way laid.

[11. After and so soon as the said Tramway has been Repair of constructed and laid down the Promoter shall, of his roads on own expense, at all times maintain and keep in good con- dition and repair, with such materials and in such manner as the Director of Public Works shall direct and to his satisfaction, so much of any road whereon any tramway belonging to the Promoter is laid as lies between the rails of the tramway and where a double line of tramway is laid by the Promoter in any road at a distance of not more than four feet from cach other) the portion of the road between the two lines of tramway, and in every case so much of the road as extends eighteen inches beyond the rails of and on each side of any such tramway. Except as aforesaid the Promoter shall not be liable to pay for the cost of the maintenance or repair of any road whereon the tramway is laid.]

and level

[12. The Promoter shall maintain in good condition and Maintenance repair, and at their proper level so as not to be a danger or annoyance to the ordinary traffic, the rails of which the of rails. tramway for the time being consists, and the substructura upon which the same rest ; and if the Director of Public Works shall from time to time, or at any time hereafter, alter the level of any road along or across which the tramway shall be laid, then and in such event, and so often as the same shall happen, the Promoter shall, at his own expense, alter his rails so that the uppermost surface thereof shall be on a level with the surface of the road as altered, and if the Promoter makes default in complying with any of the provisions of this section, he shall, for every offence, les subject on summary conviction to a penalty not exceeding one hundred dollars aud, in case of a continuing offence, to a further penalty not exceeding twenty-five dollars for every day after the first on which such default continues, j

[13. Where by reason of the execution of any work Temporary affecting the surface er soil of any road along which the tramways tramway is laid, it is, in the opinion of the Diretor of Public may be made Works, necessary or expedient temporarily to remove or dis- Hecessary. continue the use of such tramway or any part thereof, the

When

1413