THE HONGKONG GOVERNMENT GAZETTE, SEPTRMBER 2, 1910. 335
Rule
35
When an authority to proceed lapses.
36
Pushing Engine.
37
Complement of Guards.
38
39
40
41
42
Travelling Crane.
43
Means of communication with passengers.
Maximum load of trucks or waggons.
-Vehicles to be attached to passenger trains.
--Dangerous vehicles.
--Train lights.
44
Tail lamps and tail boards.
45
---Speed limits.
46
47
18
19
Permission to work ballast trains.
50
51
52
53
54
55
56
37
58
59
60
Train parting.
61
Speed of trains through facing points.
Speed of trains through interlocked facing peints. Train running through station.
-Warning before moving a ballast train.
Protection of ballast train when stabled.
Protection of points
-Moving of vehicles so as to obstruct Running Road,
Shunting on steep gradients.
Loose shunting.
Working in case of accident or failure.
Train stopped between stations.
Sending advice of accidents or breakdowns.
Light engine stopped on line.
Portion of train left on line.
62
63
64
Chapter IV.
SYSTEMS OF WORKING TRAINS.
-Systems of working.
Chapter V.
ONE ENGINE ONLY.
Essentials of the one engine only system. Application of the one engine only system.
Chapter VI.
LINE CLEAR SYSTEM.
-Essentials for working the Line Clear System
Permission to approach when to be given.
65
66
67
68
-Line Clear Ticket.
69
70
71
222
Authority to proceed when to be given.
Obstructing the Line.
Chapter VII.
ABSOLUTE BLOCK SYSTEM.
-Essentials of the Absolute Block System.
-When the line shall not be considered clear.
72 -When permission to approach has been given.
73
Chapter VIII.
USE OF ELECTRICAL INSTRUMENTS ON
SINGLE LINE.
-Description of Electrical Instruments.
74 ---Signalling of trains.
--Certificate of Competence.
75
76
-Bell Code.
No comments yet.
Private notes are available after approval.