TNAG-2981-FCO40-1473-Guangdong-nuclear-power-station-project-1982 — Page 196

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

noted pain

1/4

B/U

CONFIDENTIAL

1. Avere 166/1.

13

3

QOO

>

B,C

attached

E

WW), B(WP)

(paras

11-13)

F attached to

AKIZ 164/1

1881

Sir E Youde

хожава

2013

GUANGDONG NUCLEAR AND CASTLE PEAK POWER PROJECTS

گیا

FG 714

1. The DOI's presentation on Guangdong and Castle Peak will now take place on the morning of 5 April instead of 25 March, because of a clash with the departure of the Guangdong Power Company/China Light and Power delegation now visiting the UK.

2.

Before the presentation you may wish to glance through the attached files, in particular the papers flagged.

3.

On Guangdong, the present position, in a nutshell, is that for the time being both the Anglo/US and the Anglo/French options are being kept open. This does not please Lord Kadoorie, who favours the French option, as his exchange with the Prime Minister shows.

4.

The Chinese, for their part, have still to reach a decision on the construction of a nuclear power station in preference to a conventional one, but their final conclusions are expected soon.

5.

As for the Castle Peak projects, 'Steam to set' at Castle Peak 'A' took place at the end of February. The Prime Minister is expected to perform the official opening ceremony during her visit this September. The order for the 'sister' Castle Peak 'B' power station, said to be the largest single export contract awarded to the UK, was placed in August 1981.

@power

R D Clift

24 March 1982

Hong Kong and General Department

cc

Mr Donald

Mr Elliott FED

Did not take

fake place

1

CONFIDENTIAL

7/4

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note