they should still contribute significantly to increasing the capacity and labour productivity of the building and civil engineering industries (10).

5.14

The

Figures are not yet available for making a meaningful assessment of the growth in building and civil engineering output in the first half of this year. But in the public

sector a rapid growth rate, close to the 24% forecast at the

(11), beginning of the year

is likely to be achieved.

public works programme includes the provision of public housing (aiming at 40 000 flats a year up to 1985) and work on

such large civil engineering projects as the Island Eastern

Corridor road and the Island Line of the Mass Transit

Railway. As for output in the private sector, the present

property market does cast some doubt on the

state of the

/ possibility

(10)

Retained imports of construction machinery

$Mn

Year-on-year growth rate in money terms (%)

1978

1979

1980

1981

1982 Jan-Jun

(11)

178

-7

239

34

265

11

467

76

216

-12

Estimates of expenditure on building and construction

At constant (1973) prices ($Mn)

Private

Public*

Total

1977

2,888

(27.8)

2,283 (41.9)

5,171

(33.7)

1978

2,813

(-2.6)

2,866 (25.5)

5,679

(9.8)

1979

3,082

(9.6)

2,850

(-0.6)

5,932

(4.5)

1980+

3,822

(24.0)

2,819

(-1.1)

6,641

(12.0)

1981++

3,930

(2.8)

3,011

(6.8)

6,941

(4.5)

1982+++

4,240

(8%)

3,730

(24%)

7,970

(15%)

Note:

Including MTR

()

+

++

Revised preliminary estimates

Percentage change on preceding year Revised provisional estimates

Budget forecast

43

Comments