Surveyors, Widnell).
Farrell have now produced revised PSDS to take
their
account of the above changes Farrell's revised drawings maintained
the quality and operational efficiency of the buildings. We therefore instructed Farrell in March 1993 to Fgress their
proposals to Final Sketch Design in order to maintain the current programme for occupation by 1 July 1996.
haliter
مد
and
6. The future Consulate General, as now designed, will satisfy all HMG's post-1997 needs, and house them in a quality construction kinkding of
litling
www providing excellent value for money We will effectively, as the
Foreign Secretary noted in his minute to the Prime Minister, (get a building at half price. The estimate cost is also beiver: the Treasury published suffly Estimates for 1993/94 which sintes in table I that the cost of the Hong Kong project is £29m.
to look at ways of reducing
Nevertheless mi
the costs:
·
continue
(a) Reduce further the requirements of the Consulate-General
and British Council
PCAS3.784
To achieve any real cost savings on construction we would
need to reduce by a whole floor. The British Council
final their/rev:
hally
have completed their review of their requirements and
have identified a saving of 320m2 nett (approximately
mme
floor). But this space can be immediately and
and/sensibly
utilised by Procurement Section (nett requirements 360m2 )
who were omitted from the Consulate-General side in our
RESTRICTED
1
J
?
(b)
earlier cost savings exercise: this will prevent the need
mene
for Procurement Unit to be housed off site in/expensive
leased premises. The_FCO/ODA Management Review Staff (MRS)
(five commed out;
Section began, en 22 March 1993 a further review of
future staffing of the Consulate-General.
Their interim
report suggests that the previously envisaged staffing
nemenn right,
Thise
requirements are generally satisfactory except for the
to meet.
?
tan O
Passport Section, which has varied year cyclical
demand. The main implication of this is that the
currently designed passport space could be underused to
about cri
live) the extent of whole floor (1000m2 gross for out of
if other uses were not found to crccupy the spare year cycle, we are now considering various
every
We
کس
parkerin
-fively
to
a
options, including/renting we anticipate that the DCF
er the
To fimport Section appraisals, which are being prepared, but not yet
1
(given that the land is cort-fuce) available, will show that it is more economical,
nomical/to
and have under-used space for a period compared to
mane
renting and fitting out the exact requirements on a
yearly basis. His, obvidualy,
obodily in becand
the
build
Omit all the residential accommodation and amenities.
is our strongly-held view that the flats represent
particularly good value for money; they are thoroughly
cost-effective as compared to renting (please see alse
इ
It
DCF appraisals) and should be retained. I alw have an
From the point operational value hom being on sike. of view of designed concept and operational efficiency of
the buildings, it would be technically possible to omit
the 7 remaining UK staff flats and amenities without
serious impact, but their deletion would not be sensible.
PCAS3.784
RESTRICTED
1
RESTRICTED
(c) Reduce the building specification
experkice
this area
area),
The current estimate includes savings already made by
optimisation of the substructure design on this difficult
sloping site, and by reducing some of the specifications
and particularly Surines (who i se a developer's & and refinements to the designs. We will continue to look
for ways of reducing the specifications without
unacceptably detracting from the quality of the building,
when we receive the Final Sketch Designs and Report.
OED to find the shortfall of funds-from-elsewhere-in-the-
Overseas Estates programme.
would
This option will be extremely painful and will entail
delays on other projects Nevertheless, we believe that
any
meeting the currently forecast excess over the PES
provision could be done, with careful management, without
unacceptably-distorting the capital programme.
A decision will be taken in the light of the appraisal of options for the passfort -issuing operations &
Given these options, our initial appraisal is that24
boquether
and 4 (d)/åre the only ones which avoid being unrealistic
or theconomic in the long term.
7.
all
I attach a completed Project Approval Proforma. I also attach
DCF appraisals of both this project and the only other
eurrently realistic option i.e. renting. As stated in para 1 we fully appraised in 1989/90 other options and/those that included involving land cost elements remain relatively expensive in
comparison with building on the free Colvin House Site. The
terms of the PTG prevents the use of our site for "Commercial"
nuuh mae
PCAS3.784
RESTRICTED