TNAG-2958-FCO40-4237-Future-of-Hong-Kong-British-Consulate-General-Colvin-House--1993 — Page 17

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

5

should he that the lot is not for which he acquired

any other compromise whatsoever subsequently determine fit for the purposes the lot.

Exclusion of warranty

Indemnity by Grantee

Setting out

1

5. (a) The Government has given no warranty, express or implied, as to the suitability or fitness of the lot or any part thereof for development whether in accordance with these Conditions or otherwise. The Grantee for himself, his successors or assigns undertakes not to make any claim against the Government for any loss or damage whatsoever which he may suffer as a result of or arising from the state and condition of the lot making it either unfit for the purpose for which he acquired the lot or rendering it impossible to achieve the scale of development originally intended.

(b) The Government in no

way warrants the accuracy or correctness in any way whatsoever of any information made available or obtained, and in particular does not warrant that the lot is fit and suitable for any particular purpose.

6.

The Grantee shall indemnify and keep indemnified the Government against all actions, proceedings, liabilities, demands, costs, expenses and claims whatsoever arising from any damage caused to adjacent or adjoining land where such damage has, in the opinion of the Director (whose opinion shall be final

binding upon the Grantee), arisen out of any development or redevelopment affecting the lot or part thereof or out of

any other works which the Grantee is required to undertake in compliance with these conditions.

7. (a) The Director will, at such time as he thinks fit or upon the application of the Grantee, set out the lot on the ground and the Grantee or his authorized representative after such setting out when called upon by the Director will attend at the lot to inspect the survey marks delineating the lot on the ground and will be given a plan showing the positions and descriptions of each such mark. The Grantee shall not commence any operations for building on the lot until it shall have been so set out by the Director. The Grantee shall take to be taken all proper care and precautions to safeguard the said survey marks from disturbance or removal. If, before commencing any operations for building on the lot, any of the said survey marks are disturbed or removed, the Grantee shall apply in writing to the Director for replacement by survey and shall pay on demand to the Government in advance the prescribed fee therefor.

or cause

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.