GOVERMENT HOUSE HONG KONG.
WED 21 APR 93 09:46
PG.10
Follow-up Reports For
Append. 1
1.
Time after shutdown
2.
3.
5.
6.
7.
Procedure in use
Primary coolant
- circulation mode
flow rate
Sub cooling margin
Water level in core
Hr. Min.
Natural/forced
m3/hr
OC
Core submerged/ uncovered
°C
bar
8.
9.
10.
11.
Hot leg temperature
Primary coolant
pressure
Safety injection
- operating mode
flow rate
Auxiliary feedwater pump - operating mode
flow rate
Containment spray
- operating mode
flow rate
Dose rate in containment building
High pressure/low pressure/ Accumulator/Recirculation
m/hr.
#1/#2/#3, Electric/Tirbo m2/hr
No spray/spray/Recirculation m2/hr
mSv/hr
12.
Readings of plant
13.
radioactivity monitors
primary coolant
secondary system (N16, condenser)
- steam generator
blowdown
Availability of power
supply
- off-site (Grid,
auxiliary supply) on-site (diesel generators)
No comments yet.
Private notes are available after approval.