J
Through Train :
HKB 012/7
REC
kinese Public Statement2
7
ΓΑ
GISTRY
1393
REGISTRY Action Taken
The Index and its enclosed press cuttings at Annex summarises selected press reports on statements on the through train made by named Chinese authorities in the past
few
The following suggests some analyses and
months.
comments on these press reports:
( સ ) Early July, or the S of S's Peking visit on 9 July, appears to be a watershed in the Chinese side's public position
then,
statements had typically taken the lines that
(i)
(ii)
the on
matter.
Before
Chinese
the NPC Decision is already sufficiently clear about through train and about what constitutes
"upholding the BL";
in accordance with the Decision the matter is to be dealt with by the PC [and no one else];
and
(b)
(2)
(iii)
therefore the matter can only be dealt with in 1996 after the PC has been set up (and not
earlier).
The only exception is the SCMP report in May (see TV). According to the report Zhou Chengkui recognised the technical feasibility (and political necessity) for the SC/NPC to give explanation on the NPC Decision
provisions.
The
agreeing to the
report also quoted Xu Chongde as technical feasibility of an SC/NPC But the reports were not picked up by papers, and the points had not been echoed by
other Chinese spokesmen
explanation.
other
Possibly The first detectable change came after the
S of
visit.
Ou 10 July the press reported the
3 of S
raised through train as
the talks.
i as saying that
This
H his meeting with Qian he had one of the two basic issues in countered by adverse Chinese
not
27/7/93
No comments yet.
Private notes are available after approval.