SWIRE PROPERTIES PROJECTS LTD

BRITISH CONSULATE

GENERAL, HONG KONG

CLARIFICATION OF GENERAL POINTS

1.

2.

3.

4.

5.

6.

7.

The Architect should provide the name only of the consultants and Quantity Surveyor advising him in his proposal. Detailed submission from these firms will be dealt with separately.

Architect's submission should be made by 10 April 1992 in Hong Kong. Receipt of submission in UK will be accepted up to 13 April 1992.

The earliest date for possession of the site is 1 January 1993. The latest date is 1 April 1993.

Photographs

the report.

of any model can be presented on either the boards or in

4 copies of the report are required.

A comparison of the Architects area provision with the SOR is required and can be incorporated as an Appendix to the report.

The Architect should indicate the most competitive fee for the complete design team in the Cost Plan.

The detailed breakdown of the fee between the various disciplines should be included in the report.

JDH/s1/05/03/92