03-1992 17:08
STRE PROPERTIES PROJECTS LTD
BRITISH CONSULATE GENERAL, HONG KONG
-
CLARIFICATION OF DESIGN BRIEF
832 bid154)
7.24
Annex E
1.
The
2.
3.
4.
5.
structural integrity of the cladding should be designed to cater normal wind loading. No special conditions need to be taken
for into consideration.
Allow for 11.5mm anti-bandit glass to be used over the full height of the building.
Pedestrian access only will be permitted along the eastern boundary of the site. No vehicular access is permitted along this boundary.
Allow а provisional sum of $500,000 for Artwork to be included in the Cost Plan under Furniture.
The kitchen indicated on Diagram 1 between F14 and J3 is a general provision for the area in accordance with the requirement of Q3.
G9 is required as described in the SOR.
6.
7.
Green Zones 1 & 2
can be combined but should be capable of being separated in the future.
8.
9.
10.
11.
12.
A2 and A3 should have direct connections to the general circulation in addition to the interconnections referred to in the SOR.
One vehicle lock will serve for both vehicles accessing the carpark and service vehicles.
no objections are
to
vertical connections
between
areas
There stipulated in the design brief to be interconnected.
Lift
shafts may pass through, and, lift machine rooms may be located over "Red Zone" areas provided there is a solid separation.
In staff accommodation a full bathroom can be provided en-suite to bedroom 1 in lieu of 2 "shower" and in addition to the common bathroom.
The Satellite Dish (Q11) is to be located on the site (not remote).
13.
14.
The need
to
the
"Protected"
and "High Ammenity as
of the viability of transplanting any
Value" trees is a matter for the
15.
Architect to advise on.
The extent of any future surplus space that may be converted to "Lettable" space is indeterminate.
judgement.
The Architect should use his OWTI