SCHEDULE OF REQUIREMENTS
POST: CONSULATE-GENERAL HONG KONG
SCHEME: NEW OFFICES
DATA: DECEMBER 1991
SECTION
OFFICER OR
NO
GRADE
FUNCTION
OF
CLASSI - FICATION
NETT AREA
REMARKS
STAFF
(1)
(2)
(3)
(4)
(5)
(6)
(7)
GENERAL ADMINISTRATION
(80)
Director
1
B
U/C
325
(81)
PA to Director
1
LEII
U/C
150
(82)
Director
of 1
DOA
U/C
200
Administration
(83)
Admin General Office
2 X LEII
U/C
1100
1 X LEIII
1 X LEIV
(84)
Waiting Area
U/C
150
(85)
Accounts
5
1 X LEII
900
3 X LEIII
1 X LEIV
(86)
Conference Room
(87)
Staff Room
(88)
Arts Officer
LEI
500
500
U/C
150
(89)
Arts General 3 Office
1 X LEIII
U/C
500
2 X LEIV
(90)
Exchange Unit, Director
1
E
U/C
200
(91)
Corporate 1
LEI!
U/C
150
Relations Manager
(91)(a)
CRM Asst.
1
LEIII
U/C
100
(92)
Exchange unit | 2
LEIII
U/C
450
assts
(103)
General Storage
HONGKONG.SOR
U/C
1000
In addition provide en-suite toilet and washroom facilities.
Interconnect with (80). Includes space for file storage.
Should be partly glazed for supervision into (83) and (85).
Includes space for filing, photocopier, fax, telex, stationery and storage. Provide B/R glass screen and 1 speech unit and document passing facility into (84).
Provide direct access for public from main building entrance via stairs and/or lift without need to access other public waiting areas: provide air lock access to staff area controlled from (83): Doors of airlock should interlock to allow only one door to be open at a time.
Provide adjacent kitchenette (see also Q(3)).
Should be partly glazed for supervision into (89).
Includes space for filing and storage. Could be open plan office with 91(a) and 92.
Should be partly glazed for supervision into (92).
Should be partly glazed for supervision into 91(a).
Could be open plan with 89 and 92.
Includes space for filing, IT equipment and small reception area. Could be open plan with 89 and 91A.
Should be located on lower level to be easily accessible for loading/unloading.
No comments yet.
Private notes are available after approval.