CONFIDENTIAL
SCHEDULE OF REQUIREMENTS
POST: CONSULATE - GENERAL HONG KONG
SCHEME: NEW OFFICES
DATA: DECEMBER 1991
SECTION
OFFICER OR
NO
GRADE
FUNCTION
OF
CLASSI - FICATION
NETT AREA
STAFF
(1)
(2)
(3)
(4)
(5)
(6)
(2)
IDS Alcove
(3)
Reading Room/Area
(4)
Strong Room
0
$
S
150
15050
S
120
(5)
Communications
Equipment room
S
130
(6)
IT Systems Room
S
65
(7)
Disintegrator Room
C/S
100
(8)
Emergency Power
S
60
Unit
(9)
TSD Workshop and Store
S
200
(10)
Equipment store (TSD)
C/S
130
REG II
(12)
General Office
DS10
S
250
(13)
Strong Room
S
150
REMARKS
(7)
Should be an enclosed space within B(1).
Locate at entrance to B(1) and separated from B(1) by counter barrier. Includes space for shredder and photocopier.
Sole access from B(1). No external walls. 200mm min concrete walls.
Sole access from B1. 24 hr A/C.
Locate off B1. Access by Cambridge Door. 24 hr A/C plus UPS. No party walls.
Locate near to but outside of B(1).
Locate near to B(5).
Provide workbench, adequate power points and ventilation. Access via B(1). Floor loading
160 Kg/m2.
Locate as close as possible to the volumetric centre of the confidential and secure zones: ideally interconnect with 8(9) or A(10).
Provide Cambridge door access. 24 hr A/C required.
No external walls: Sole access via B(12). Construction specs as 8(4).
Sole access via B(12).
(14)
Office
1
DS6
S
200
(15)
Office
1/2
DS5
S
200
"Interconnect with B(14).
(16)
Office
1/2
DS7/5
S
200
(17)
Secretaries
$1/2
S
350
(18)
Dark room
S
120
Interconnect with B(15). Sole access via B(12).
Locate adjacent to B(12).
Sole access via B(12). Provide sink.
(18)(a)
Store
5)
S
100
14
睿愿
ย
10
(19)
Equipment Store
(19.1) Safe Speech Room
S
100
"1
#
➡
S
323
REG III
(20)
Office
(21)
Store
HONGKONG.SOR
Minimum dimensions 6 x 5 x 3.25 m high. Floor loading 300kg per m2. No party wall. Except with Sections A & B. Locate at entrance to suite 12.
1
DS7/8
$
130
24 hr A/C required.
Access via B(1).
S
100
Access via B(20).
CONFIDENTIAL
No comments yet.
Private notes are available after approval.