CONFIDENTIAL
3
機密
15.
closing
Tenders
were
invited
in
date is
1 February 1993.
is scheduled for mid 1993.
September
1992.
The
Award of the licence(s)
16.
No contingency plans have been considered.
HEC SCA
17.
SES
The HK Electric Company's SCA is valid until December 1993. Consultations have begun on renewal. believes these might be concluded in December 1992.
18.
The Chinese side have been informed that the SCA will end in December 1993 and that negotiations with HEC on renewal have commenced. As consultations with HEC have not concluded the Chinese have not been consulted on any new
SCA.
19.
however,
has a year to run. Our leeway is, Shareholders will be anxious if by the Chinese once HKG and HEC have
The SCA still
not that long. the SCA is held up agreed.
Refuse
Transfer Stations and Chemical Waste Treatment
Facilities
20.
These are important parts of the solid waste disposal strategy.
21.
The Chinese side have not been consulted.
The
projects were considered to have small post 1997 obligations. This decision is being reconsidered.
Contracts are scheduled for sometime in 1993.
22.
23.
No contingency plans have been considered.