ANNEX A

Non-ACP Franchises and major contracts

to be let before 31 December 1993

WENT Lanfill

This is an important part of the solid waste disposal strategy. It will be a Design Build Operate (BDO) Contract valid for up to 55 years.

2.

It has already been introduced into the JLG. A general note on landfills was delivered on 26 July 1991. A specific note on the WENT landfill itself was delivered on 15 November 1991. Technical questions were asked by the Chinese side on 16 October.

3.

Tenders are

Tenders are already in. The Central Tender Board (CTB) will consider the tender on 17 December. valid until May 1993.

4.

If the WENT landfill does not proceed on schedule SPEL advises that solid waste disposal would quickly become SPEL has been advised to look at contingency

difficult.

plans.

SENT and NENT Landfills

5.

These are similar in importance to WENT.

Also DBO

contracts valid for over 40

years for NENT.

years for SENT and about 50

6.

Both have already been

Speaking notes were delivered

11 September 1992 (NENT).

introduced into the JLG.

on 3 April 1992 (SENT) and

CONFIDENTIAL #3