TNAG-2479-FCO40-3609-International-Atomic-Energy-Agency-(IAEA)-and-Hong-Kong-1992 — Page 7

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

Expert post No.:

Nil

Special field:

Duty station:

Duration of proposed assignment:

When required (specify month & year):

Duties (Please specify in detail or attach a draft job description):

If, for example, the construction of a facility must be completed, or some equipment must be on hand before the expert arrives, please give details.

The expert should arrive

☐ before ☐ after

the

building has been completed.

major equipment items are on hand.

Acceptable working language of expert:

(first choice)

or

(second choice)

If a specific expert is requested, please indicate name and address. It does not however follow that the Agency will automatically employ the expert named.

Expert post No.:

Nil

Special field:

Duty station:

Duration of proposed assignment:

When required (specify month & year):

Duties (Please specify in detail or attach a draft job description):

If, for example, the construction of a facility must be completed, or some equipment must be on hand before the expert arrives, please give details.

The expert should arrive

☐ before ☐ after

☐ building has been completed.

the

major equipment items are on hand.

Acceptable working language of expert:

(first choice)

or

(second choice)

If a specific expert is requested, please indicate name and address. It does not however follow that the Agency will automatically employ the expert named.

TA-1E/Rev.3 (Jul 87)

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.