List of Consultancies for New Airport and Related Projects
Brief Scope of Consultancy
Chek Lap Kok | 1. Airport Master Plan Study - air traffic
Airport
forecasts, layout for the Chek Lap Kok airport, civil engineering design and environmental impact assessment.
as at 1st Oct
r, 1992
Commencement Date/ Main
Consultant
Managing Department (Officer-in-Charge)
Nationality (Origin) of Consultant
Agreement Completion Date
Agreement No./ | Funding
Type/ Fee ($M)
Source/
PWP No.
14 July 1990 Greiner - Maunsell J.V.
Provisional Airport Authority (Mr F Uiterwijk - 824 7333)
USA/ HK(UK)
PAA 01/90
PAA
IDC
$ 256 M
2. Chek Lap Kok - management assistance
to PAA
10 September 1990 International Bechtel Incorporated
-
3. Passenger Terminal Complex Detailed Design Consultancy - prepare detailed architectural and engineering design work required for the passenger terminal at the new airport
4. Site Preparation Contract Design
5. New Airport Traffic Study
6. Airport at Chek Lap Kok - To consult on
documentation, tendency, procurement, selection & installation of Air Traffic Control Equipment to support the new airport.
7. Runway/Airfield Tunnels
Provisional Airport Authority (Mr K Owen - 802 3565)
USA
29 February 1992 (Substantial Completion) Final reports on minor studies submitted in August 1992. (Completed)
9 September 1991 Terminated on 30 July 1991 (Completed)
PAA 03/90 Management
PAA
$ 19.4 M
2 March 1992
The Mott Consortium
Provisional Airport Authority (Mr Peter Wright - 824 7388)
HK(UK)/ UK/ HK(UK)
March 1994 (Underway)
101
IDC
PAA
$ 536 M
1 July 1992 Greiner - Maunsell J.V.
Provisional Airport Authority (Mr David Corby - 824 7337)
USA/ HK(UK)
105
PAA
(Underway)
DC
$ 12 M
3 August 1992 Wilbur Smith Associates - Hong Kong
Provisional Airport Authority (Mr David Corby - 824 7337)
HK(USA)
190
PAA
(Underway)
November 1992
Civil Aviation Department (Mr Peter Bodiley - 867 4520)
November 1992
Provisional Airport Authority (Mr David Corby - 824 7337)
Page No. 1
150
PAA