TNAG-2415-FCO40-3517-Hong-Kong-Port-and-Airport-Development-Strategy-(PADS)-fina-1993 — Page 34

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

List of Consultancies for New Airport and Related Projects

Brief Scope of Consultancy

5.

6.

7.

Commencement Date/

Main Consultant

Managing Department/ Officer-in-Charge

Nationality (Origin) of Consultant

Agreement Completion Date

Report Date: 17 December 1992

Agreement No./ Type Fee ($ M)

Funding Source/

PWP No.

Civil Engineering Department (Mr I Basham - 762 5380)

UK

December 1991 (completed)

CE 29/82 (EXT

16AA

8)

FS

$ 1 M

Replacement Airport at Chek Lap Kok : Investigation - Structural geology study for PADS - a study on the Seismotectonics and crustal structures

pertinent to Hong Kong

Fill Management Study - Phase II Dredging Studies related to marine borrow areas

10 March 1991 British Geological Survey

October 1990 Dredging Engineering Management Studies

Civil Engineering Department (Mr P Whiteside - 762 5397)

Fill Management Study - Phase II Investigation and Development of marine borrow areas

8.

9.

Owner Controlled Insurance Programme - To advise Government on the merits of an insurance programme for the airport core projects and to evaluate,

recommend and market a scheme

Airport Works Management - Phase II

Netherlands

March 1993 (underway)

CE 44/90

FS

$ 3.4 M

361CL

December 1990

Binnie Consultants Ltd.

Civil Engineering Department (Mr P Whiteside - 762 5397)

HK(UK)

December 1992 (underway)

CE 42/90

FS

2001AX

$ 22 M

September 1991 Gilman Swire Willis Limited

NAPCO, Works Branch (Mr RJ Harris - 829 6204)

HK(UK)/ HK(UK)/ UK

September 1997

(underway).

1 February 1992 International Bechtel

Incorporated

NAPCO, Works Branch (Mr H K Wong - 829 6209)

USA

January 1994 (underway)

10. Environmental Project Office (ENPO) - Environmental monitoring and audit of West Kowloon Project Area

27 August 1992 CES Consultants in Environmental Sciences (Asia) Ltd./Binnie Consultants

Ltd. J.V.

11

Lok On Pai Refurbishment Works - Design

Environmental Protection Department (Mr M Nash - 835 1131)

HK(UK)/ HK(UK)

September 1994

(underway)

Insurance

$ 21 M

CE 1/92 Management

$ 194.05 M

+ $ 25.95 M

(Contingency)

+ $ 17 M (Additional works)

CE 4/92

Environment Monitoring

$ 12 M

3AG

4AG

366CL

September 1992 Llewelyn-Davies Weeks Hong

Kong Ltd.

Provisional Airport Authority (Mr David Corby - 824 7337)

HK(UK)

106

(underway)

PAA

2AG

Page No. 16