Highways
6. Lok On Pai Refurbishment Works
(Contract No. 211)
7. West Kowloon Reclamation
Sewage Network - Package 1 (Contract No. UA 16/92)
|October 1992
to
Provisional Airport Authority
to be determined
AA
Notice of
Prequalification to be invited in Nov/Dec 92. |March 1995 Tenders to be invited in April 1993.
June 1993
to
Territory Development Department
$150M ($60M from EPD)
332CL/B
(Mr S O Chan - 882 7195)
January 1993
Highways Department
$1,850M
505TH/A
to
(Mr C K Wong - 721 6792)
January 1997
Tenders to be invited in August 1992.
1. Route 3 - Cheung Ching Tunnel and
associated road works
(Contract No. HY/92/02) - Construction of about 0.8km of dual 3-lane highway (generally at grade) on NW Tsing Yi, and a 1.6km long dual 3-lane bored tunnel within Tsing Yi.
2. Route 3 - Kwai Chung Viaduct
(Contract No. HY/92/04) - Construction of 3km of dual 4-lane viaduct, generally 20m above ground level, along the Kai Chung Road Corridor
3. Route 3 - Rambler Channel Bridge and
associated roadworks
(Contract No. HY/92/03) - construction of a 0.5km dual 3-lane bridge crossing the Rambler Channel, and a 0.7km dual 3-lane viaduct along the south of Kwai Chung Park.
4. North Lantau Expressway, Tung Chung
section (Contract No. HY/92/05) - Construction of about 2.6km of dual three-lane highway on north Lantau, including site formation for the twin-track airport and utility reserve (incl. watermains)
Notice of Prequalification
invited on
3 April 1992.
Notice of Prequalification invited on 29 May 1992. Tenders to be invited in September 1992.
Notice of Prequalification
to be invited in August 1992.
Tenders to be invited
in November 1992.
Notice of Prequalification
to be invited on 14 August 1992. Tenders to be invited in December 1992
February 1993
Highways Department
$2,694M
505TH/A
to
(Mr CK Wong - 721 6792)
September 1996
April 1993
Highways Department
$848M
505TH/A
to
(Mr C K Wong - 721 6792)
May 1996
May 1993
Highways Department
$777M
to
(Mr S C H Wan - 721 6540)
August 1996
451TH/B
177WF/B
&