LIST OF CURRENT CONSULTANCIES
Airport
Civil Engineering
Brief Scope of Consultancy
1. Passenger Terminal Complex Detailed Design Consultancy - prepare detailed architectural and engineering design work required for the passenger terminal at the new airport
2. New Airport Transport Study
3. Site Preparation Contract Design
1. Central and Wanchai Reclamation
investigation and design of reclamation with the first phase to form land for the airport railway.
2. West Kowloon Reclamation
investigation, design,construction and supervision of reclamation and infrastructure to provide land for PADS transport reserves and urban development
3. North Lantau Development -
development study of North Lantau and Phase I design. (Scope of consultancy also covers the study of other phases of development on North Lantau)
4. Fill Management Study - Phase II
Dredging Studies related to marine borrow areas
5. Fill Management Study - Phase II
Investigation and Development of marine borrow areas
Commencement Date/ Main Consultants
|2 March 1992
The Mott Consortium (Joint Venture of Mott Connell Ltd./ BAA plc / Foster HK Ltd.)
3 August 1992
Wilbur Smith Associates - Hong Kong
1 July 1992
Greiner-Maunsell J.V.
4 June 1990
Maunsell Consultants Asia Ltd.
July 1990
Mott MacDonald Hong Kong Ltd.
August 1990
Mott MacDonald Hong Kong Ltd.
October 1990
Dredging Engineering Management Studies
December 1990
Binnie Consultants Ltd.
6. West Kowloon Reclamation Reprovisioning - 22 November 1991
Construction of Cheung Sha Wan Wholesale Balfours Internationall (Asia) Consulting Market Phase 1
Highways
1. North Lantau Expressway - detailed design and construction supervision of highway, railway and utility reserve formations.
11
Engineers Ltd.
July 1990
Mott MacDonald Hong Kong Ltd.
No comments yet.
Private notes are available after approval.