9. West Kowloon Reclamation Short term

flow survey of existing drainage system (Contract No. UA 6/90)

10 West Kowloon Reclamation - Inspection

of sewerage system including CCTV survey (Contract No. UA 4/90)

25 September 1990

[22 February 1991

to

30 July 1991

Territory Development Department (Mr K Austin - 848 2668)

UA 6/90

Delta Surveys Ltd 354CL

$1.5M

18 January 1991

8 March 1991

to

16 June 1991

Territory Development Department (Mr K Austin - 848 2668)

UA 4/90

Pearsall Dynarod Ltd.

354CL

$1.20M

11 Chek Lap Kok Airport – Marine site

investigation at the Brothers

Works Order issued in

December 1990

17 December 1990

Provisional Airport Authority | GCO Term |GCO Term

PAA

to

(Mr P Leung – 802 3490)

Contract

22 August 1991

Contractor

Gammon

Construction Ltd.

$4.8M

12 Chek Lap Kok Airport – Marine site

investigation at East Sha Chau

16 August 1991

16 September 1991

Provisional Airport Authority | PAA 3/91

Lam Geotechnics

PAA

to

(Mr P Leung 802 3490)

Ltd.

(Contract No. PAA 3/91)

|24 November 1991

$8M