Brief Scope of Consultancy

Airport

1. Airport Master Plan Study - air traffic forecasts, layout for the Chek Lap Kok airport, civil engineering design and environmental impact assessment.

Civil

Engineering

1. Fill Management Study - Phase II

Information Management System

2. Geological Survey (Extension 7 :

Fill Management Study - Phase II Specialist Geophysical Interpretation)

3. Replacement Airport at Chek Lap Kok: Investigation - Structural geology study for PADS a study on the

Seismotectonics and crustal structures

pertinent to Hong Kong

NEW AIRPORT AND RELATED PROJECTS

LIST OF CONSULTANCIES COMPLETED

Commencement Date/

Main Consultants

Managing Department (Officer In-Charge)

Agreement Nationality Completion

(Origin)

Date

14 July 1990 Greiner-Maunsell joint

Provisional Airport Authority (Mr G T Oliver - 802 3427)

US/HK(UK) 20-12-91

venture

! January 1992

Agreement No./ Type/Fees($M)

PAA 1/90

IDC

$153.3M +

Contingencies

$16.7M

Funding Source/

PWP No.

PAA

September 1990 Au Posford

Consultants Ltd.

Civil Engineering Department (Mr P Whiteside – 301 1234)

UK

6-91

CE 43/90

362CL

FS

$22M

October 1990 British Geological Survey

Civil Engineering Department (Mr P Whiteside – 301 1234)

UK

12-91

CE 29/82(ext 7)

36ICL

FS

$2.7M

10 March 1991

British Geological Survey

Civil Engineering Department (Mr I Basham - 762 5390)

UK

12-91

CE 29/82(ext 8)

16AA

FS

$IM

Financial

1. Financial Study on Lantau Fixed Crossing and Airport Railway,

May 1990

Transport Branch

UK

31-3-91

N/A

Kleinwort Benson Ltd.

(Mr S H Siu - 810 2103)

FB's block

vote

Highways 1. Airport Railway Feasibility Study –

investigation of alignment, station locations and operation of airport railway, and traffic forecast.

March 1990

Acer Consultants (Far East) Ltd. and Maunsell Consultants Asia Ltd.

joint venture.

Highways Department

(Mr V J Mansfield – 369 7520)

-

Environment Protection Department - EA/EIA studies |(Mr W J Farrell - 835 1102)

2. Route 3 Design Stage I Preliminary

design for alignment CRAI and detailed design for Kwai Chung advance work

June 1990

HK(UK)/ HK(UK)

3-91

CE 46/89

36TR

FS

$15.6M+$4.4M

Scott Wilson/ Parsons

Brinckerhoff/ Haswell/

Wilbur Smith

Highways Department (Mr C K Wong - 702 6792)

HK(UK)/ HK(US)/

4-91

CE 55/89

ID

339TH

HK(UK)/

$83.7M

HK(US)

Comments