RESTRICTED
PRIORITY
TO PEKING
INFO BTC HONG KONG
YOUR TELNO 567: HONG KONG AIRPORT: MAIN BRIDGE CONTRACT
MANZIE
1. WE KNOW OF NO (NO) VISITING DELEGATION FROM THE UK.
(ANGLO/JAPANESE CONSORTIUM) WHOM WE HAVE CONSULTED, SAYS THE AJC
HAVE NO (NO) PLANS FOR AN EARLY VISIT.
2. THE AJC ARE IN DISCUSSION WITH THREE CHINESE FIRMS WITH A
VIEW ΤΟ THEIR PARTICIPATING, GIVEN THE RIGHT PRICE AND
CONDITIONS, AS SUBCONTRACTORS IN THEIR CONSORTIUM. THESE ARE:
YIU LIAN, Α SUBSIDIARY OF CHINA MERCHANT
MERCHANT HOLDINGS, FOR THE
ASSEMBLY OF THE BRIDGE DECK AT SHEKOU. AJC ARE WELL ADVANCED IN
TALKS WITH A VIEW TO YIU LIAN CARRYING OUT THE ASSEMBLY WORK
UNDER THE SUPERVISION OF THE TRAFALGAR HOUSE SUBSIDIARY CLEVELAND
ENGINEERING AND/OR MITSUI
STRUCTURAL
SHIPBUILDING;
ENGINEERING AND
CORPORATION FOR
CHINA STATE SHIPBUILDING
FABRICATION OF PART OF THE DECK STRUCTURE; AND CHINA HARBOUR
ENGINEERING AS A SUBCONTRACTOR TO GAMMON CONSTRUCTION, HONG KONG,
FOR MARINE WORK FOR THE SUBSTRUCTURE OF THE BRIDGE (GAMMON, JOINT
OWNED BY TRAFALGAR HOUSE AND JARDINES, WILL BE AJC'S LEAD
SUBCONTRACTOR FOR THE SUB-STRUCTURE.)
3.
PLEASE THEREFORE EXPLAIN TO ZHANG OF CHINA ROAD AND BRIDGE
THAT THE AJC ARE ALREADY IN DISCUSSION WITH OTHER CHINESE
CORPORATIONS ABOUT SUBCONTRACT WORK ON THE BRIDGE, AND HAVE BEEN
FOR SOME TIME, BUT WITHOUT GOING INTO THE DETAILS IN PARA 2
ABOVE.