HONG KONG AIRPORT PROJECT: THE PLATFORM CONTRACT.

SUMMARY

fa

из

16/3

1. BIDS WERE SUBMITTED BY THE SIX GROUPS ON 12 MARCH FOR THIS

CONTRACT WHICH WITH A VALUE OF APPROXIMATELY POUNDS 1.0 BILLION IS THE LARGEST IN THE WHOLE AIRPORT COMPLEX. THE RESULT IS LIKELY TO BE ANNOUNCED BY LATE APRIL OR EARLY MAY. TWO OF THE GROUPS ARE BRITISH LED, BY COSTAINS AND BY BALFOUR BEATTY RESPECTIVELY, AND MOWLAM WHO ARE PART OF A FRENCH LED GROUP. ALTHOUGH NO BIDS HAVE BEEN MADE PUBLIC, RUMOURS, WHICH APPEAR WELL-INFORMED, SUGGEST THE COSTAINS BID WAS THE LOWEST AND THE BALFOUR BEATTY BID

SECOND. THIS SHOULD OMEN WELL FOR AN ULTIMATE BRITISH SUCCESS IN

THIS MAMMOTH CONTRACT.

DETAIL

2. BIDS WERE SUBMITTED FOR THE 12 MARCH DEADLINE FOR THE PLATFORM CONTRACT BY SIX INTERNATIONAL GROUPS. ALL GROUPS DIVIDED THE WORK INTO DREDGING AND FILLING WHICH THEY TERM THE WET SIDE AND THE DRY SIDE. DUTCH AND OTHER DREDGING COMPANIES THEREFORE FEATURE LARGE IN EACH.

3. THE GROUPS ARE AS FOLLOWS:

(A) HONG KONG AIRPORT RECLAMATION GROUP

BALFOUR BEATTY (UK)

LEIGHTON (HK/AUSTRALIAN/GERMAN)

DILLINGHAM (USA)

FRANKI CHK/GERMAN)

HOCHTIEF (GERMAN)

OBAYASHI (JAPAN)

HYUNDAI (KOREA)

BLANKERVOORT (DUTCH)

DRAGOMAR (ITALY).