OG MINN 1992
IN22
+ 002 537 1940
7.01
Master Plan
·
Airport site: 1.248 hectares
- one quarter existing islands;
- three quafters reclaimed.
Planned to satisfy forecast demand in 2040
- 87.3 million passengers:
- 8.9 million tonnes of air cargo:
- 375.500 aircraft movements.
.
Two parallel runways
- 3.800m length:
·
. 300m clearways;
60m width
- 1.525m separation.
Five parallel taxiways and four crossfield
taxiways provided.
Midfield passenger terminal complex.
Rescue and Firefighting
Isolated Aircraft Parking Position
Fire Training Facility
Air Traffic Control Complex
Compass Calibration Pad
+
Centralized terminal processing buildings,
One attached and one satellite terminal
CONCOUTSE.
120 aircraft parking positions.
·
Road, rail and ferry access along eastern site boundary,
+
·
Three road bridges to the site.
Midfield aircraft maintenance facility.
A majority of support and ancillary
facilities located south of the southern
runway,
General Facts
Runway*
Gates - Frontal
14
!
O
+
Airport Phase I Opening
Phase II
Aircraft Maintenance
Sea Rescue
Sea Channel
2
Government Flying
Services Department
30
120
Airport Maintenance
1
2
42
30
Gates - Hardawand
18
20
Gate - Toul Reclamation (beclares)
70
1,248
it
= ૪ ૪ ૪
Passenger Terminal Building Area (14 □) People Mever Operation Baggage System Tusnci Kerbside - Departures (1) Kerbside - Arrivalı (m) Rail Station (2 level)
455.000 $33.000 Sbunie Saunde TuCanTvg/Can
$90,000
600 920
770 1.010
Loop Auto/DCV
1.430 1.760
1
1
Carpark Spaces
2,600
3,750
7,400
Cargo
Building Area (sq m) Gates
297,000
10
457,000
14
1,737,000
28
Maintenance
Building Arts (sq m) Aircraft Parking Spaces
245.000
$
371.000
11
$33.000
1$
Celering
Building Area (1970)
60.230
91.200
190.500
Airport Layout Plan
Ground Support
Equipment Maintenance
Aviation Fuel Storage
Rescue and Firefighting-
Aviation Fuel Storage-
Lantau Island
31
No comments yet.
Private notes are available after approval.