TNAG-2344-FCO40-3410-Future-of-Hong-Kong-British-Consulate-General-1992 — Page 210

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

28-OCT-1991 18:09

BRITISH TRADE COMMISSION

6

Cutting away

(19) Where consent has been given pursuant to Special Condition No. (18) hereof for any cutting away, removal or setting back of any land, or any building up or filling in or any slope treatment works of any kind whatsoever within the lot or on any Government land which is required for the purpose of or in connection with the formation, levelling or development of the lot or any part thereof or any other works required to be done by the Grantee under these Conditions, the Grantee shall carry out, construct or bear the cost of the carrying out 'or construction of such slope treatment works, retaining walls or other support, protection, drainage or ancillary or other works as shall or may then or at any time thereafter be necessary to protect and support such land within the lot and also any adjacent or adjoining Government or leased land and to obviate and prevent any falling away, landslip or subsidence occurring thereafter, and shall at all times during the term hereby granted maintain at his own expense the said land, slope treatment works, retaining walls or other support, protection, and drainage works in good and substantial repair and condition to the satisfaction of the Director. In the event that as a result or arising out of any formation, levelling, development or other works done by the Grantee any falling away, landslip or subsidence occurs at any time, whether in or from any land, within the lot or from any adjacent or adjoining Government or leased land, the Grantee shall at his own expense reinstate and make good the same to the satisfaction of the Director and shall indemnify the Government its agents and contractors from and against all costs, charges, damages, demands and claims whatsoever which shall or may be made, suffered or incurred through or by reason of such falling away, landslip or subsidence. In addition to any other rights or remedies herein provided for breach of any of these Conditions the Director shall be entitled by notice in writing to call upon the Grantee to carry out, construct and maintain the said slope treatment works, retaining walls, land or other support, protection, and drainage works or to reinstate and make good any falling away, landslip or subsidence, and if the Grantee shall neglect or fail to comply with such notice to the satisfaction of the Director within the period specified therein the Director may forthwith execute and carry out the work and the Grantee shall on demand repay to the Government the cost thereof.

No rock crushing

(20)

Anchor

maintenance

No rock crushing plant shall be permitted on the lot.

(21) Where prestressed ground anchors are installed, upon development or re-development of the lot or any part thereof, the Grantee shall at his own expense carry out regular maintenance and regular monitoring of the prestressed ground anchors throughtout their service life to the satisfaction of the Director and shall supply to the Director such reports and information on all such monitoring works as the Director may from time to time in his absolute discretion require. If the Grantee shall neglect or fail to carry out the required monitoring works, the Director may forthwith execute and carry out the monitoring works and the Grantee shall on demand repay to the Government the cost thereof.

P.07

Page 210Page 211

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.