TNAG-2259-FCO40-3255-Hong-Kong-Port-and-Airport-Development-Strategy-(PADS)-Brit-1991 — Page 16

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

UNCLASSIFIED

12

4

MDLIAN 2822

HOCHTIEF AG

LEIGHTON CONTRACTORS PTY LIMITED

KIER HONG KONG LIMITED

FRANKI KIER LIMITED#

IMPREGILO SPA

AMERICAN BRIDGE COMPANY

SHUI ON CIVIL CONTRACTORS LIMITED

CHINA STATE CONSTRUCTION ENGINEERING CORPORATION

(3) HYUNDAI ENGINEERING AND CONSTRUCTION CO. LIMITED.

(4) LFC INTERNATIONAL

NIPPON STEEL CORPORATION (JOINT VENTURE LEADER)

KOBE STEEL LIMITED

MITSUBISHI HEAVY INDUSTRIES LIMITED

NKK CORPORATION

NISHIMATSU CONSTRUCTION CO LIMITED

KUNAGAI GUMI CO LIMITED

THE PROJECT CONSISTS OF TWO SUSPENSION BRIDGES, THE TSING MA AND KAP SHUI MUN BRIDGES WHICH WILL BE LINKED BY A VIADUCT OVER

MA WAN ISLAND.

THE TSING MA BRIDGE, CROSSING THE CHANNEL BETWEEN TSING YI AND MA WAN, WILL HAVE A MAIN SPAN 1 377 METRES LONG, AND 2 167 METRES LONG OVERALL. IT WILL BE ONE OF THE WORLD'S LONGEST

SUSPENSION BRIDGES.

THE BRIDGE WILL HAVE SIX TRAFFIC LANES ON ITS UPPER DECK. THE LOWER DECK WILL CARRY TWO SHELTERED TRAFFIC LANES FOR EMERGENCY USE AND THE AIRPORT RAILWAY.

TENDERS FOR BUILDING THE OTHER BRIDGE, KAP SHUI MUN BRIDGE, AND THE MA WAN VIADUCT, WERE INVITED ON NOVEMBER 5. THE CLOSING DATE FOR SUBMISSION OF THOSE TENDERS IS JUNE 4, 1992.

WILSON

YYYY

PAGE

2

UNCLASSIFIED