TNAG-2251-FCO40-3235-Hong-Kong-Port-and-Airport-Development-Strategy-(PADS)-fina-1991 — Page 39

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

Port

PORT AND RELATED PROJECTS

LIST OF CONSULTANCIES TO COMMENCE IN THE NEXT TWELVE MONTHS

1 September 1991

Nationality

Managing Department Officer In-charge

(Origin) of Consultant [HK/UK/USA

Expected Completion Date

Agreement No./ Type/ Fees $M

Funding Source/ PWP No.

December 1992

CE 57/90

FS $20M

[2001AX/ |374CL

Brief Scope of Consultancy

1. Western Harbour Development Study -

Feasibility study of the marine-based facilities to be provided.

2. Tseung Kwan O Port Development Study -

Feasibility study of Area 137 in southeast of Tseung Kwan O for the proposed deep waterfront industry (120 hectares) and Area 131 in south-west of Tseung Kwan O for the multipurpose terminals or container berth or general port related industries.

Expected Commencement Date

19 September 1991

APH Consultant (joint venture of Acer, |Au-Posford Consultant

Ltd and Frederic R Harris Inc)

December 1991

Civil Engineering Services Department/Port Development (Mr K K Chan -- 739 6265)

Territory Development Department/South East New Territories

(Mr C W Chung - 301 1378)

December 1992

CE 59/90

2003 AX

FS

$8M

3. Siu Lam Development Study (To plan a

preferred scheme for the proposed typhoon shelter and anchorage in Siu Lam).

March 1992

Territory Development

March

Department/Tuen Mun

1993

N/A FS

2003 AX

Development Office

$6M

(Mr W C Chan - 451 3237)

4. Detailed design of Special Industry in Area April 1992

38 (Detailed design of reclamation and associated works).

Territory Development

March

N/A

321CL

Department/Tuen Mun

1993

DC

Development Office

$80M

(Mr W C Chan - 451 3237)

- 1 -

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.