TNAG-2251-FCO40-3235-Hong-Kong-Port-and-Airport-Development-Strategy-(PADS)-fina-1991 — Page 35

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

NEW AIRPORT AND RELATED PROJECTS

LIST OF CONSULTANCIES TO COMMENCE IN THE NEXT TWELVE MONTHS

1 September 1991,

Brief Scope of Consultancy

Expected Commencement Date

Managing Department (Officer In-Charge)

Nationality

(Origin) of

Agreement Completion

Date

Agreement No./ Type/Fees($M)

Funding Source/

PWP No

Consultant

Airport

1. Passenger Terminal Complex Detailed Design Consultancy - prepare detailed architectural and engineering design

|December 1991

Provisional Airport Authority (Mr Peter Wright - 802 3419)

12.93

ГРАА

IDC

work required for the passenger terminal at the new airport

Financial

1. Financial Study to assist Government in the 19 September 1991

negotiation with MTRC on the

Transport Branch

4.92

FB's vote

(Mr H K Wong - 810 2108)

implementation of the Airport Railway project.

FS $6M

2. Financial Study of Western Harbour

Crossing to assist in the preparation of privatisation document

September 1991

Transport Branch

1.93

FB's vote

(Ms E Cheng - 810 2558)

FS $10M

Highways

1. Lantau Fixed Crossing - Lantau

Approach Road including Toll Plaza (may include Toll Collection System)

October 1991

Highways Department |(Mr K H Lee - 721 4307)

4.98

D $20M

2002AX & 476TH

2. Lantau Fixed Crossing -

November 1991

Traffic Control & Surveillance

Highways Department (Mr K H Lee - 721 4307)

4.98

D $15.8M

2002AX & 476TH

Water Supplies

1. Water Supply to North Lantau and raw

water transfer to Silvermine Bay Treatment Works

15 September 1991

Water Supplies Department (Mr CH Ng 829 4408)

6.96

CE 12791

[2005AX

IDC

$29.81M

Management

1. Airport and Related Projects Overall

Works Management – Phase II

January 1992

Works Branch

(Mr A Fung - 829 6780)

1.

$6M funded by non-PADS item 172WF

Management

NA

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.