NEW AIRPORT AND RELATED PROJECTS LIST OF CONSULTANCIES UNDER WAY

1 September 1991

Commencement Date/ Main Consultants

Managing Department (Officer In-Charge)

Provisional Airport Authority (Mr G T Oliver 802 3427)

(Origin)

[US/HK(UK) 20.12.91

-

Agreement

Nationality Completion Agreement No./

Date Type/Fees($M)

PAA 1790 IDC $153.3M + Contingencies $16.7M

Airport

Civil Engineering

Brief Scope of Consultancy

1. Airport Master Plan Study - air traffic

forecasts, layout for the Chek Lap Kok airport, civil engineering design and environmental impact assessment.

1. Central and Wanchai Reclamation

investigation, design and construction supervision of reclamation with the first phase to form land for the airport railway.

2. West Kowloon Reclamation –

investigation, design,construction and supervision of reclamation and infrastructure to provide land for PADS transport reserves and urban development

3. North Lantau Development -

-

development study of North Lantau and Phase I design.

(Scope of consultancy covers also other phases of development on North Lantau)

4. Fill Management Study - Phase II

Dredging Studies related to marine borrow areas

5. Geological Survey (Extension 7:

Fill Management Study - Phase II Specialist Geophysical Interpretation)

6. Fill Management Study - Phase II

Investigation and Development of marine borrow areas

14 July 1990 Greiner-Maunsell joint

venture

21 June 1990(on time charge) Maunsell Consultants Asia Ltd.

July 1990

Mott MacDonald Hong Kong Ltd.

August 1990

Mott MacDonald Hong Kong Ltd.

Funding Source/

PWP No.

PAA

Territory Development Department (Mr K Austin - 848 2668)

[HK(UK)

beyond 1997

CE 10790 IDC $61M

262CL & 353CL

Territory Development

Department (Mr K Austin - 848 2668)

www

Territory Development

Department (Mr T D Armour

- 805 6390)

HK(UK)

1999

CE 12/90 IDC $103.2M

702/354CL

HK(UK)

4.96 (PHASE 1)

CE 19/90 IDC $96M

352CL & 371CL

October 1990 DEMAS

Civil Engineering Services Department (Mr P Whiteside 301 1234)

Dutch

3.92

CE 44/90 FS $1.6M

361CL

October 1990

Civil Engineering Services

UK

12.91

CE 29/82(ext 7) |361CL

British Geological Survey Department (Mr P Whiteside

FS

301 1234)

$2.7M

December 1990 Binnie

Civil Engineering Services Department (Mr P Whiteside - 301 1234)

HK(UK)

4.92

CE 42/90

FS

364CL

$22M