including side spans carrying road and rail traffic from Ma Wan to North Lantau. To be
constructed on a design and build basis. The viaduct will link this bridge to the Tsing Ma bridge.
First stage of the
tender information to be
released to tenders in May 1991
October 1996
6540)
3. Route 3 Interchange(Advance Work)
site formation for the interchange
July 1991
October 1991
to
April 1994
Highways Department (Mr K S Leung - 721 6540)
476TH
4. North Lantau Expressway, Tai Ho Section
construction of about 6 km of a dual three-lane
highway on north Lantau, including site formation for the twin-track airport railway and utility reserve.
5. North Lantau Expressway, Yam O Section -
construction of about 4 km of a dual three-lane
highway on north Lantau, including site formation for the twin-track airport railway and utility reserve.
6. Lantau Fixed Crossing - Traffic Control and
Surveillance control and surveilance measures from North Lantau to Kwai Chung.
Privatization 1. Western Harbour Crossing - financing, Projects designing, constructing and operation
of a 1.5 km tunnel crossing of the Victoria Harbour between West Kowloon and Sai Ying Pun. The tunnel may accommodate up to a dual three-lane road.
Site Investigation
1.
Central and Wanchai Reclamation - Phase I site investigation for Phase I reclamation and marine borrow area.
Tenders to be invited in
January 1992
Highways Department
$2015M
1451TH
to
(Mr C H Wan - 721 6029)
April 1996
August 1991
Tenders to be invited in
November 1991
April 1992
Highways Department
$1750M
451TH
to
(Mr C H Wan - 721 6029)
April 1996
January 1992
September 1992
Highways Department
$280M
1476TH
to
October 1996
(Mr K S Leung - 721 6540)
Notices of Prequalification January 1993 will be gazetted in Novemb
1991 Bids to be invited
from prequalified tenders in April 1992
|Highways Department
$4000M
to
December 1996
(Mr J M Turner - 573 3885)
July 1991
to
Tenders to be invited in April 1991 |(pending Govt's decision) January 1992
Territory Development Department (Mr K
| Austin - 848 2668)
UA 2/90
No comments yet.
Private notes are available after approval.