4.
Fill Management Study - Phase II
Investigation and development of marine
borrow areas
5 December 1990
DEMAS
5.
Replacement Airport at Chek Lap Kok
: Investigation - Structural geology study for
PADS
- a study on the Seismotectonics
and crustal structures pertinent to Hong Kong
Highways
1.
Western Harbour Crossing Feasibility Study additional works
Civil Engineering Services
6.92
British Geological Survey
|Department (Mr P Whiteside -
301 1234)
Dutch
CE 44/90
2362CL
|2361CL
UK
CE 29/82(ext) 2364CL
Au-Posford
Binnie
HK/HK(UK) |HK(UK)
CE 43/90
CE 42/90
FS
$80M
10 March 1991
Civil Engineering Services
10.10.91
CE 29/82(ext) 2016AA
Department (Mr M S Leung - 368 9768)
$1M
January 1990
Highways Department
HK(UK)/
5.91
CE 20/89
6426TH
Western harbour Crossing Consultants (joint venture of Acer, Maunsell, Parson
(Mr J M Turner - 573 3885)
HK(UK)/
HK(US)/
FS
$4M
HK/HK(UK)
Brinkerhoff, Pypun-Howard Humphreys)
12.
Lantau Fixed Crossing - preparation of
tender document
November 1990
|Highways Department
HK(UK)
5.91
CE 11/78
89TH
Mott MacDonald H.K. Ltd.
|(Mr K S Leung – 721 6540)
D
$15M
13.
Route 3 Design Stage I
4.
Preliminary design for alignment CRA1 and detailed design for Kwai Chung advance work
May 1990
Scot Wilson/ Parsons
Brinkerhoff/ Haswell/
Wilbur Smith
Highways Department (Mr C K Wong - 702 6792)
HK(UK)/
4.91
CE 55/89
339TH
-
HK(US)/
D
HK(UK)/
$83.7M
HK(US)
|Highways Department
HK(UK)
4.97
CE 18/81
Mott MacDonald H.K. Ltd.
(Mr C H Wan - 721 6029)
IDC
468TH &
451TH
$100M
North Lantau Expressway - detailed design and construction supervision of highway, railway and utility reserve
formations.