New PWP
Item
New PWP
Item
Projects
-
3. Lantau Fixed Crossing - Kap Shui Mun Bridge
and Ma Wan Viaduct a bridge of 691 metres including side spans carrying road and rail traffic from Ma Wan to North Lantau. To be constructed on a design and build basis. The viaduct will link this bridge to the Tsing Ma bridge.
4. North Lantau Expressway, Tai Ho Section
construction of about 6 km of a dual three-lane
highway on north Lantau, including site formation for the twin-track airport railway and utility reserve.
Notices of Prequalification November 1991
gazetted on 16.11.90
First stage of the tender information to be
released to tenders in
March 1991
Highways
to
August 1996
Department (Mr K S Leung 721 6540)
New PWP
Item
August 1991
January 1992
Highways
468TH
to
Department (Mr K S
April 1996
Leung - 721 6540)
-
November 1991
April 1992
Highways
468TH
to
April 1996
Department (Mr K S Leung - 721 6540)
5. North Lantau Expressway, Yam O Section
construction of about 4 km of a dual three-lane highway on north Lantau, including site formation for the twin-track airport railway and utility reserve.
6. Lantau Fixed Crossing - Traffic Control and
Surveillance - control and surveilance measures from North Lantau to Kwai Chung.
Privatization 1. Western Harbour Crossing - financing,
designing, constructing and operation of a 1.5 km tunnel crossing of the Victoria Harbour between West Kowloon and Sai Ying Pun. The tunnel may accommodate up to a dual three-lane road.
January 1992
September 1992
to
Notices of Prequalification will be gazetted in March 1991 Tenders to be invited from prequalified tenders in September 1991
November 1996
Highways
Department (Mr K S Leung 721 6540)
www
Highways
Department (Mr J M
Turner 573 3885)
No comments yet.
Private notes are available after approval.