TNAG-2251-FCO40-3235-Hong-Kong-Port-and-Airport-Development-Strategy-(PADS)-fina-1991 — Page 16

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

New PWP

Item

New PWP

Item

Projects

-

3. Lantau Fixed Crossing - Kap Shui Mun Bridge

and Ma Wan Viaduct a bridge of 691 metres including side spans carrying road and rail traffic from Ma Wan to North Lantau. To be constructed on a design and build basis. The viaduct will link this bridge to the Tsing Ma bridge.

4. North Lantau Expressway, Tai Ho Section

construction of about 6 km of a dual three-lane

highway on north Lantau, including site formation for the twin-track airport railway and utility reserve.

Notices of Prequalification November 1991

gazetted on 16.11.90

First stage of the tender information to be

released to tenders in

March 1991

Highways

to

August 1996

Department (Mr K S Leung 721 6540)

New PWP

Item

August 1991

January 1992

Highways

468TH

to

Department (Mr K S

April 1996

Leung - 721 6540)

-

November 1991

April 1992

Highways

468TH

to

April 1996

Department (Mr K S Leung - 721 6540)

5. North Lantau Expressway, Yam O Section

construction of about 4 km of a dual three-lane highway on north Lantau, including site formation for the twin-track airport railway and utility reserve.

6. Lantau Fixed Crossing - Traffic Control and

Surveillance - control and surveilance measures from North Lantau to Kwai Chung.

Privatization 1. Western Harbour Crossing - financing,

designing, constructing and operation of a 1.5 km tunnel crossing of the Victoria Harbour between West Kowloon and Sai Ying Pun. The tunnel may accommodate up to a dual three-lane road.

January 1992

September 1992

to

Notices of Prequalification will be gazetted in March 1991 Tenders to be invited from prequalified tenders in September 1991

November 1996

Highways

Department (Mr K S Leung 721 6540)

www

Highways

Department (Mr J M

Turner 573 3885)

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.