TNAG-2251-FCO40-3235-Hong-Kong-Port-and-Airport-Development-Strategy-(PADS)-fina-1991 — Page 159

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

"BRANCH (TS (G)

952 3241186

P.24

6 July 1991

NEW AIRPORT AND RELATED PROJECTS LIST OF CONTRACTS ENVISAGED TO BE INVITED FOR TENDER

IN NEXT THREE MONTES,

Civil Engineering

Brief Scope of Contract

1. Airport Site Preparation Contract

excavation of approximately 90 million cum of Chek Lap Kok Island and reclamation of about 1000ha for the new airport site, meluding construction of wawnil & drainage work

West Kowloon Reclamation - hinterland drainage package 1A

reconstruction of about

1000m of existing stormwater culverts in the most urgent phase of a three-phase programme of casential imŞINA URTEGEN DE

3. Tung Chung development, phase 1, site formation

Highways

1. Lantau Fired Crossing – Tsing Ma Bridge -

2032 metre long suspension bridge with a central span of 1, 377 metres carrying road and rail traffic from Tsing Yi to Ma Wan.

– 4

Site Investigation

2 Lantau Fixed Crossing – Kap Shui Mun Bridge

and Ma Wan Viaduct - a bridge of 891 matres including side spans carrying road and rail traffic from Ma Wan to North Lantau. To be constructed on a design and build basia. The viaduet will link this bridge to the Taing Ma bridge.

3. Route 3 interchange(Advance Work)

site formation for the interchange

1. Central and Wanchai Reclamation – Fhase I -

site investigation for Phase I reclamation and marine borrow ares.

2. North Lantau Expressway Site Investigation

Phase 2

Tender Inuitusimm

Date

Notice of Prequalification published on 15.3.91 Tenders to be invited in September 1991

August 1991

October 1991

Nodce of Prequalification

gazetted on 16.11.50

Tenders to be invited in July 1991

Notice of Prequalification

zuzetted on 16.11.90

Tenders to be invited in

August 1991

August 1991

T'anders to be invited in July 1991

Water Supplies

3. Route 3 design stage 2, site investigation

1. Temporary Water Supply to North Lantau Construction of Tai Tung Shan Service Rece=min

2. Temporary Water Supply to North Lantau Mainlaying from Shek Mun Kap to Tai Po

【pending Govt's decision)

Works Order to be issued in August 1991

August 1991

Teaders to be invited in August 1991

August 1991

LIST OF CONTRACTS TO LET LET IN NEXT THREE MONTHS

Water Supplies

Project

1. Temporary work supply to North Lantau Cheung Sha to

Pak Kong Au (Contract value: $6.4 million)

Tender Expiry Date

1 August 1991

2. Cheung Sha Pumping Station (Contract Value: $6.8 million) 18 July 1991

DA 39H

QC IT A −).

TA,

ONNY ONTH