PUUSE
¡Aprü 1991
May 1991
¡August 1991
-
Ceatrai and Wanchai Reclamation - Phase 1 -
reciamation of about 40 ba and conxruxion of
around 1.110 metres of sea wall, bot Preca,
Rumsey Street and Tamar to provide land for the expansion of the Central Business Arcs and the Airport Railway Terminus as well as conmruction of replacement forry piers and air conditioning intake facilities.
Highways 1. Route 3 Sector between Kwai Chung and Lai
Chi Kok
construction of approx. 4 km of a duai 4-lane highways on cievated strctures.
Projects
korun Lantau Expressway, Tai Ho Section construction of about 6 km of a dual three-lane highways on north Lantau, including site formation for the twin-track airport railway.
3. North Laniau Expressway, Yam O Section –
construction of about 4 km of a dual three-ians
highways on north Lantau, including site formation for the twin-track airport railway,
Privatization (1. Route 3 Sector between Kwai Chung and Ting
Kau - possible bid package for financing, designing, constructing and operation of about 6 km of dual-three lane roads on a cable stayed. high level bridge, elevated structures, bored Tunneis, and a medium level bridge.
2. Western Harbour Crossing - bid package for
financing, designing, constructing and operation of
■ 1.5 km (unnel crossing of the Victoria Harbouri betwood West Kowloon and Sai Ying Pun. The
tunnel may accommodate a dual three-lam. The
tunnel may socommodate a dual three-lane road and
possibly also a twin-track railway.
|November 1991
March 1991
April 1991
PHEE S
Territory Development Department
(Mr K Austin – '848 2668)
Highways Department (Mr H S Kwong – 733 2508
Highways Department
(Mr K S Leung - 721 6540)
Highways Department
(Mr K 5 Leung – 721 6540)
Highways Department
(Mr H S Kwong – 733 2508
|Highways Department
(Mr 1 M Turner – 573 3885)
Silo
Investigation
1.
Route 3 - site investigation for road aligment (CRAI route) between Ting Kau and Sham Shui Po.
September 1990
2. North Lantau Expressway – sito investigation for September 1990
new alignment.
3. Central and Wanchai Reclamation – Phase I – site October 1990
investigation for Phase I reclamation and maraino
borrow area,
4. Route 3 site investigation for highways
-
February 1991
between Tai Lam Country Park and Au Tau.
Highways Department
(Mr H S Kwong - 733 2508)|
Highways Department
(Mr K S Leung – 721 6540)
Territory Development Department
(Mr K. Austin – 848 2668)
Highways Department (Mr H S Kwong - 733 2508)