Lap Kok, tenders will be invited by the

Fluvialutal alipoIL AULNORITY (PAA) ON 16

November from the shortlisted prequalified

LenueLEIS

·

Is the intention that the contract

should be let at the start of January. Before

then, the Government will prepare the necessary

temporary arrangements to enable the PAA to take

possession of the land required for this contract

to start.

(D)

the October list of works was issued before the

decision was taken not to proceed with the Build,

Operate and Transfer arrangement for the Lantau

Fixed Crossing. Attached to the list is,

therefore, a summary of the five contracts which

Government now intends to let to construct the

Crossing (two for the bridges, two for road links

to them, and one for traffic control). Your

attention is drawn to the fact that public

invitations will be issued on 16 November through

auver Lisements