Ceairai and Wanchai Reclamation Phaol

reciamauon of about 40 ha and congruation of

around 1.110 metres of sea wall betwee

Rumsey Street and Tamar to provide land for the expansion of the Central Business Arca and the Airport Railway Terminus as well as connruction of replacement forry piers and air conditioning intake facilities,

1. Route 3 Sector between Kwai Chung and Lai

Chi Kok construction of approx. 4 km of à dusi 4-lane highways on elevated arctures.

May 1991

August 1991

November 1991

March 1991

Projects

norio Lantau Expressway, Tai Ho Section –

construction of about 6 km of a dual three-lane highways on north Lantau, including site formation for tho twin-track airport railway.

3. North Lantau Expressway, Yam ✪ Section –

construction of about 4 kmm of a dual three-ians

highways on north Lantau, including site formation for the twin-track airport railway,

Privatization (1. Route 3 Sector between Kwai Chung and Ting

Kau – possible bid package for financing, designing, constructing and operation of abou 6 km of dual-three lans roads on a cable stayed. high level bridge, clevated structures, bored Tunnels, and a medium level bridge.

2. Western Harbour Crossing - bid package for

financing, designing, constructing and operation of a 1.5 km tunnel crossing of the Victoria Harbouri between West Kowicon and Sai Ying Pun. The

tunnel may accommodate a dual three-iam Tho

tunnel may socommodate a dual three-lane road and possibly also a twin-track railway,

Sito

Investigation

1.

April 1991

PHGE 08

Nopment

Territory Develo Department

(Mr K Austin – '848 2668)

Highways Department

(Mr H S Kwong

733 2508

Highways Department

(Mr K S Leung – 721 6540)

Highways Department

(Mr KS Leung - 721 6540)

Highways Department

(Mr H S Kwong - 733 2508

Highways Department

|(Mr J M Tumer - 573 3885)

2.

Route 3

-

site investigation for road aligment

September 1990

(CRA] route) between Ting Kau and Sham Shui Po.

North Lantau Expressway – sito investigation for September 1990 new alignment.

-

3. Central and Wanchai Reclamation – Phaso I – site October 1990

invesugation for Phase I rociamation and maraino

bartów area.

4. Route 3 - site investigation for highwaye

February 1991

between Tai Lam Coutury Park and Au Tau.

Highways Department

(Mr H S Kwong – 733 2508)|

Highways Department |(Mr KS Leung - 721 6540)

Territory Development Department

(Mr K Austin – 848 2668)

Highwaye Department (Mr H S Kwong - 733 2508)

...