JUM
Highways
-
¡Aprü 1991
-
Ceairai and Wanchai Reclamation Phaol
reciamauon of about 40 ha and congruation of
around 1.110 metres of sea wall betwee
Rumsey Street and Tamar to provide land for the expansion of the Central Business Arca and the Airport Railway Terminus as well as connruction of replacement forry piers and air conditioning intake facilities,
1. Route 3 Sector between Kwai Chung and Lai
Chi Kok construction of approx. 4 km of à dusi 4-lane highways on elevated arctures.
May 1991
August 1991
November 1991
March 1991
Projects
norio Lantau Expressway, Tai Ho Section –
construction of about 6 km of a dual three-lane highways on north Lantau, including site formation for tho twin-track airport railway.
3. North Lantau Expressway, Yam ✪ Section –
construction of about 4 kmm of a dual three-ians
highways on north Lantau, including site formation for the twin-track airport railway,
Privatization (1. Route 3 Sector between Kwai Chung and Ting
Kau – possible bid package for financing, designing, constructing and operation of abou 6 km of dual-three lans roads on a cable stayed. high level bridge, clevated structures, bored Tunnels, and a medium level bridge.
2. Western Harbour Crossing - bid package for
financing, designing, constructing and operation of a 1.5 km tunnel crossing of the Victoria Harbouri between West Kowicon and Sai Ying Pun. The
tunnel may accommodate a dual three-iam Tho
tunnel may socommodate a dual three-lane road and possibly also a twin-track railway,
Sito
Investigation
1.
April 1991
PHGE 08
Nopment
Territory Develo Department
(Mr K Austin – '848 2668)
Highways Department
(Mr H S Kwong
733 2508
Highways Department
(Mr K S Leung – 721 6540)
Highways Department
(Mr KS Leung - 721 6540)
Highways Department
(Mr H S Kwong - 733 2508
Highways Department
|(Mr J M Tumer - 573 3885)
2.
Route 3
-
site investigation for road aligment
September 1990
(CRA] route) between Ting Kau and Sham Shui Po.
North Lantau Expressway – sito investigation for September 1990 new alignment.
-
3. Central and Wanchai Reclamation – Phaso I – site October 1990
invesugation for Phase I rociamation and maraino
bartów area.
4. Route 3 - site investigation for highwaye
February 1991
between Tai Lam Coutury Park and Au Tau.
Highways Department
(Mr H S Kwong – 733 2508)|
Highways Department |(Mr KS Leung - 721 6540)
Territory Development Department
(Mr K Austin – 848 2668)
Highwaye Department (Mr H S Kwong - 733 2508)
...