TAVAJEVAN
LIST OF CONSULTANCIES ENVISAGED TO START IN NEXT TWELVE MONTHS
Brief Scope of Consultancy
Expected Commencement Date
Port
1.
Ma Wan Channel Improvement - Design
January 1991
12. Western Harbour Development Study
March 1991
3. Tuen Mun Port Development Study (To plan
two development schemes, with and without the proposed large thermal power station, for the proposed deep waterfront industries and cargo working area and opportunity spaces in Castle Peak areal
4. Tseung Kwan O Port Development Study
- Feasibility study of area 137 in southeast of Tseung Kwan O for the
proposed deep waterfront industry (120)
hectares) and possibly area 131 in south-west of Tseung Kwan O for the
proposed multipurpose terminals (40 or 80 hectares).
March 1991
April 1991
5. Siu Lam Development Study (To plan a preferred scheme for the proposed typhoon shelter and anchorage in Siu Lam).
May 1991
6. Detailed design of Deep Waterfront
Industry in Area 38 (Detailed design of reclamation and associated works).
August 1991
END
Managing Department
Officer In-charoe
Civil Engineering Services Department/Port Works (Mr K K Chan - 368 5985)
Civil Engineering Services Department/Port Works |(Mr K K Chan - 368 5985)
Territory Development Department/Tuen Mun Development Office
(Mr W L Wong - 451 3237)
Territory Development Department/South East
New Territories
(Mr C W Chung - 301 1377)
Territory Development Department/Tuen Mun
Development Office
(Mr W L Wong - 451 3237)
Territory Development Department/Tuen Mun Development Office
(Mr W L Wong - 451 3237)