LANTAU FIXED CROSSING

The following is additional information given at the press conference the Lantau Fixed Crossing, which were not contained in the original statement faxed to you. As usual, you will receive media cuttings on

on

the subject.

The direct construction contract approach will save between six and nine months in the construction period.

The bridge will take five-six years to build.

The construction of the bridge is a matter for Hong Kong to decide.

Not pre-empting the talks with China which are due to begin on

October 15 and last for about 10 days.

In cost terms, the Lantau fixed crossing represents only about one- airport and related the cost of the replacement of tenth

developments.

The cost of the bridge is estimated at HK$6-7 billion at present day

costs.

The overall cost of the port and airport development strategy is "still very crude",. the

detailed

design is

figures

a

lot

of

need

refinement

stili to be done on other elements.

as

Hong Kong is looking forward to the talks with the Chinese and would like to have Chinese support for the entire project.

It is important to maintain the momentum of the project.