a.

Replacement of the Main Lantau Fixed Crossing Bridge

Mr. Gordon Wu proposes replacing the Tsing Yi - Ma Wan Bridge of the Lantau Fixed Crossing and the Tsing Yi sector of Route Three with a shorter bridge between

Wan and a double deck viaduct Sham Tseng and Ma

structure over the water along the coast line from

Kwai Chung to Sham Tseng.

Facilities for both road

and rail traffic would be provided.

-

The proposal suggests using the shorter Sham Tseng Ma Wan Bridge early, to provide access for the initial

An advantage construction stages of the new airport. claimed is the availability of proven technology to

construct the bridge.

future

navigation

and

The "shorter" bridge proposed fails to meet required

clearances channel

would,

therefore, have to be much longer than suggested,

about 1,000 metres as opposed to the 850 metre off-

the-shelf design quoted.

The cost and timing advantages portrayed are therefore

not fully realized.

The Government's Tsing Yi Ma Wan bridge has been

Whether the designed after very detailed studies.

span of a bridge is 1,377 or "shorter" 1,000 metres,